{"types":[{"id":"hydro","name":"Hydroelectric dam","category":"energy","emoji":"\ud83d\udca7","icon":"r-hydro","color":"#3fa7d6","unit":"MW","description":"Hydro plants of at least 300 MW installed capacity. Plants from the WRI Global Power Plant Database (v1.3.0, data to about 2021) plus large plants found in Wikidata that it lacks; plants built since are missing, which matters most for wind and solar (T\u00fcrkiye had about 13 GW of wind and over 20 GW of solar by 2025, mostly in plants below these thresholds).","source":"tr_power"},{"id":"coal_plant","name":"Coal power plant","category":"energy","emoji":"\ud83c\udfed","icon":"r-coal_plant","color":"#5a5a5a","unit":"MW","description":"Lignite and hard-coal plants of at least 300 MW. Plants from the WRI Global Power Plant Database (v1.3.0, data to about 2021) plus large plants found in Wikidata that it lacks; plants built since are missing, which matters most for wind and solar (T\u00fcrkiye had about 13 GW of wind and over 20 GW of solar by 2025, mostly in plants below these thresholds).","source":"tr_power"},{"id":"gas_plant","name":"Gas power plant","category":"energy","emoji":"\u26a1","icon":"r-gas_plant","color":"#f08a24","unit":"MW","description":"Natural-gas plants of at least 300 MW. Plants from the WRI Global Power Plant Database (v1.3.0, data to about 2021) plus large plants found in Wikidata that it lacks; plants built since are missing, which matters most for wind and solar (T\u00fcrkiye had about 13 GW of wind and over 20 GW of solar by 2025, mostly in plants below these thresholds).","source":"tr_power"},{"id":"geothermal","name":"Geothermal plant","category":"energy","emoji":"\u2668\ufe0f","icon":"r-geothermal","color":"#d9534f","unit":"MW","description":"Geothermal plants of at least 40 MW. Plants from the WRI Global Power Plant Database (v1.3.0, data to about 2021) plus large plants found in Wikidata that it lacks; plants built since are missing, which matters most for wind and solar (T\u00fcrkiye had about 13 GW of wind and over 20 GW of solar by 2025, mostly in plants below these thresholds).","source":"tr_power"},{"id":"wind","name":"Wind farm","category":"energy","emoji":"\ud83c\udf2c\ufe0f","icon":"r-wind","color":"#9fd8cb","unit":"MW","description":"Wind farms of at least 20 MW. Wind farms come from the Turkish Wind Energy Association's list of every operating wind farm (T\u00dcREB statistics report, January 2025: 346 farms, 13,792 MW at the end of 2024); farms of at least 20 MW are drawn (214 farms, 12,778 MW, 93% of the list's capacity). Position, first that exists: a wind plant in OpenStreetMap or the WRI database whose name shares a place word with the farm and whose stated size (if any) is within a factor of 4, in the same province (or across a province line when the sizes agree within 30%); else the village or hill the farm is named after, when its province has one such place (approximate); else the centre of a district named in the farm's name (approximate); else the province centre (approximate). Farms sharing a point are spread 3 km apart. The farm appears on the timeline in the year its first phase opened and shows today's size: later extensions are not split out. Farms opened in 2025 are not in this list yet. OpenStreetMap / WRI plants only give positions here, so nothing is counted twice.","source":"tr_t_wind_farms"},{"id":"solar","name":"Solar farm","category":"energy","emoji":"\u2600\ufe0f","icon":"r-solar","color":"#ffc93c","unit":"MW","description":"Solar farms of at least 20 MW (rooftop solar not included). Solar dots are OpenStreetMap plants (power=plant, 2026) with a stated capacity of at least 20 MW (35 plants, 3,320 MW = 13% of T\u00fcrkiye's 25,927 MW of solar at the end of 2025, TE\u0130A\u015e), plus large plants from WRI. Most Turkish solar is thousands of small unlicensed plants that cannot be drawn one by one: the lens \"Solar capacity\" shows every province's total (EPDK).","source":"tr_power"},{"id":"coal_mine","name":"Coal mine","category":"mineral","emoji":"\u26cf\ufe0f","icon":"r-coal_mine","color":"#4a4038","unit":"site","description":"Coal and lignite mines. From historical USGS compilations (Mineral Resources Data System, compiled to 2011; mineral facilities, 2003): producing sites as USGS recorded them then. Many mines opened since are missing, and some listed ones have closed. Sites of one kind within 5 km are shown once. No production size is given.","source":"tr_mines"},{"id":"chromium","name":"Chromite mine","category":"mineral","emoji":"\ud83d\udd18","icon":"r-chromium","color":"#8c9aa6","unit":"site","description":"Chromite (chromium ore) mines. From historical USGS compilations (Mineral Resources Data System, compiled to 2011; mineral facilities, 2003): producing sites as USGS recorded them then. Many mines opened since are missing, and some listed ones have closed. Sites of one kind within 5 km are shown once. No production size is given.","source":"tr_mines"},{"id":"boron","name":"Boron mine","category":"mineral","emoji":"\ud83e\uddc2","icon":"r-boron","color":"#e8e2d0","unit":"site","description":"Borate mines (T\u00fcrkiye holds most of the world's known reserves). From historical USGS compilations (Mineral Resources Data System, compiled to 2011; mineral facilities, 2003): producing sites as USGS recorded them then. Many mines opened since are missing, and some listed ones have closed. Sites of one kind within 5 km are shown once. No production size is given.","source":"tr_mines"},{"id":"iron","name":"Iron mine","category":"mineral","emoji":"\u26d3\ufe0f","icon":"r-iron","color":"#8a4b2a","unit":"site","description":"Iron-ore mines. From historical USGS compilations (Mineral Resources Data System, compiled to 2011; mineral facilities, 2003): producing sites as USGS recorded them then. Many mines opened since are missing, and some listed ones have closed. Sites of one kind within 5 km are shown once. No production size is given.","source":"tr_mines"},{"id":"copper","name":"Copper mine","category":"mineral","emoji":"\ud83e\udd49","icon":"r-copper","color":"#b87333","unit":"site","description":"Copper-ore mines. From historical USGS compilations (Mineral Resources Data System, compiled to 2011; mineral facilities, 2003): producing sites as USGS recorded them then. Many mines opened since are missing, and some listed ones have closed. Sites of one kind within 5 km are shown once. No production size is given.","source":"tr_mines"},{"id":"lead_zinc","name":"Lead-zinc mine","category":"mineral","emoji":"\ud83e\udea8","icon":"r-lead_zinc","color":"#7d8a99","unit":"site","description":"Lead and zinc mines. From historical USGS compilations (Mineral Resources Data System, compiled to 2011; mineral facilities, 2003): producing sites as USGS recorded them then. Many mines opened since are missing, and some listed ones have closed. Sites of one kind within 5 km are shown once. No production size is given.","source":"tr_mines"},{"id":"silver","name":"Silver mine","category":"mineral","emoji":"\ud83e\udd48","icon":"r-silver","color":"#b8c0c8","unit":"site","description":"Silver-ore mines. From historical USGS compilations (Mineral Resources Data System, compiled to 2011; mineral facilities, 2003): producing sites as USGS recorded them then. Many mines opened since are missing, and some listed ones have closed. Sites of one kind within 5 km are shown once. No production size is given.","source":"tr_mines"}],"items":[{"type":"coal_plant","name":"Af\u015fin Elbistan Termik Santrali","x":1079.6,"y":519.9,"cell":3877,"value":2795,"detail":"2,795 MW, E\u00dcA\u015e","state":"46","cbsa":"46"},{"type":"hydro","name":"Atat\u00fcrk Dam","x":1199.6,"y":613.3,"cell":4538,"value":2400,"detail":"2,400 MW, opened 1983","state":"63","cbsa":"63","opened":1983},{"type":"coal_plant","name":"Zonguldak Eren (ZETES)","x":647.7,"y":166.9,"cell":1236,"value":2090,"detail":"2,090 MW, Eren Enerji","state":"67","cbsa":"67"},{"type":"hydro","name":"Karakaya Dam","x":1267.9,"y":527.7,"cell":3888,"value":1800,"detail":"1,800 MW, opened 1976","state":"21","cbsa":"21","opened":1976},{"type":"gas_plant","name":"Enka Gebze Do\u011falgaz Santrali","x":519.2,"y":243.8,"cell":1774,"value":1595,"detail":"1,595 MW, Enka Elektrik","state":"54","cbsa":"54"},{"type":"gas_plant","name":"Enka \u0130zmir Do\u011falgaz Santrali","x":210.7,"y":447.2,"cell":3282,"value":1520,"detail":"1,520 MW, Enka Elektrik","state":"35","cbsa":"35"},{"type":"gas_plant","name":"Bursa Do\u011falgaz Santrali","x":404.9,"y":289.4,"cell":2094,"value":1432,"detail":"1,432 MW, E\u00dcA\u015e","state":"16","cbsa":"16"},{"type":"gas_plant","name":"Ambarl\u0131 B Do\u011falgaz Santrali","x":377.9,"y":210.9,"cell":1548,"value":1351,"detail":"1,351 MW, E\u00dcA\u015e","state":"34","cbsa":"34"},{"type":"hydro","name":"Keban Dam","x":1232.4,"y":464.7,"cell":3450,"value":1330,"detail":"1,330 MW, opened 1966","state":"23","cbsa":"23","opened":1966},{"type":"coal_plant","name":"Cenal power station","x":257.6,"y":264.8,"cell":1976,"value":1320,"detail":"1,320 MW, opened 2017, Cenal Elektrik","state":"17","cbsa":"17","opened":2017},{"type":"solar","name":"Karap\u0131nar Photovoltaic Power Station","x":782.6,"y":583.4,"cell":4296,"value":1300,"detail":"1,300 MW, opened 2022","state":"42","cbsa":"42","opened":2022},{"type":"coal_plant","name":"\u0130sken Sug\u00f6z\u00fc power station","x":985.3,"y":690.3,"cell":5070,"value":1210,"detail":"1,210 MW, OYAK","state":"01","cbsa":"01"},{"type":"hydro","name":"Il\u0131su Dam","x":1510.5,"y":590.6,"cell":4338,"value":1200,"detail":"1,200 MW, opened 2019","state":"73","cbsa":"73","opened":2019},{"type":"coal_plant","name":"\u0130skenderun Atlas Termik Santrali","x":1014.7,"y":706.0,"cell":5291,"value":1200,"detail":"1,200 MW, opened 2014, Diler Holding Enerji Grubu","state":"31","cbsa":"31","opened":2014},{"type":"coal_plant","name":"\u0130\u00c7DA\u015e Bekirli-2 power station","x":234.8,"y":264.8,"cell":1976,"value":1200,"detail":"1,200 MW, opened 2011, \u0130\u00c7DA\u015e Elektrik","state":"17","cbsa":"17","opened":2011},{"type":"coal_plant","name":"\u0130\u00c7DA\u015e Biga Termik Santrali","x":225.0,"y":306.0,"cell":2193,"value":1200,"detail":"1,200 MW, \u0130\u00c7DA\u015e Elektrik","state":"17","cbsa":"17"},{"type":"gas_plant","name":"Hamitabat Termik Santrali","x":269.1,"y":146.8,"cell":1106,"value":1156,"detail":"1,156 MW, opened 1985, Limak Enerji","state":"39","cbsa":"39","opened":1985},{"type":"gas_plant","name":"Aksa Antalya Do\u011falgaz Santrali","x":517.2,"y":649.5,"cell":4716,"value":1150,"detail":"1,150 MW, Aksa Enerji","state":"07","cbsa":"07"},{"type":"coal_plant","name":"Soma power station","x":273.4,"y":402.5,"cell":2958,"value":990,"detail":"990 MW, opened 1986, E\u00dcA\u015e","state":"45","cbsa":"45","opened":1986},{"type":"gas_plant","name":"Band\u0131rma Do\u011falgaz Santrali","x":307.3,"y":273.1,"cell":2088,"value":931,"detail":"931 MW, Enerjisa Elektrik","state":"10","cbsa":"10"},{"type":"gas_plant","name":"Acwa Power K\u0131r\u0131kkale gas power plant","x":771.2,"y":350.2,"cell":2551,"value":927,"detail":"927 MW","state":"71","cbsa":"71"},{"type":"gas_plant","name":"Erzin Do\u011falgaz Santrali","x":1000.6,"y":679.9,"cell":4962,"value":904,"detail":"904 MW, Akenerji","state":"01","cbsa":"01"},{"type":"gas_plant","name":"OMV Samsun Do\u011falgaz Santrali","x":1030.4,"y":199.7,"cell":1585,"value":887,"detail":"887 MW, OMV Samsun Elektrik","state":"55","cbsa":"55"},{"type":"gas_plant","name":"Yeni Elektrik Combined Cycle Power Plant","x":450.5,"y":234.2,"cell":1770,"value":865,"detail":"865 MW","state":"41","cbsa":"41"},{"type":"gas_plant","name":"Cengiz Enerji Samsun","x":1030.7,"y":199.7,"cell":1586,"value":849,"detail":"849 MW, Cengiz Enerji","state":"55","cbsa":"55"},{"type":"gas_plant","name":"Ambarl\u0131 A Do\u011falgaz Santrali","x":378.5,"y":211.4,"cell":1548,"value":816,"detail":"816 MW, E\u00dcA\u015e","state":"34","cbsa":"34"},{"type":"gas_plant","name":"Baymina Ankara Do\u011falgaz Santrali","x":685.1,"y":360.2,"cell":2656,"value":798,"detail":"798 MW, opened 2004, Baymina Enerji","state":"06","cbsa":"06","opened":2004},{"type":"gas_plant","name":"Turcas Denizli Do\u011falgaz S.","x":417.1,"y":562.7,"cell":4166,"value":775,"detail":"775 MW, Turcas Elektrik","state":"20","cbsa":"20"},{"type":"gas_plant","name":"Enka Adapazar\u0131 Do\u011falgaz Santrali","x":519.3,"y":232.4,"cell":1774,"value":770,"detail":"770 MW, Enka Elektrik","state":"54","cbsa":"54"},{"type":"hydro","name":"Alt\u0131nkaya Dam","x":967.4,"y":186.3,"cell":1364,"value":700,"detail":"700 MW","state":"55","cbsa":"55"},{"type":"hydro","name":"Birecik Dam","x":1163.4,"y":662.2,"cell":4863,"value":672,"detail":"672 MW, opened 2000","state":"27","cbsa":"27","opened":2000},{"type":"hydro","name":"Deriner Dam","x":1481.5,"y":186.8,"cell":1502,"value":670,"detail":"670 MW, opened 2012","state":"08","cbsa":"08","opened":2012},{"type":"hydro","name":"Upper Kalek\u00f6y Dam","x":1429.8,"y":453.2,"cell":3353,"value":637,"detail":"637 MW, opened 2012","state":"49","cbsa":"49","opened":2012},{"type":"coal_plant","name":"Kemerk\u00f6y power station","x":277.5,"y":643.8,"cell":4703,"value":630,"detail":"630 MW, opened 1994, Limak Enerji","state":"48","cbsa":"48","opened":1994},{"type":"coal_plant","name":"Yata\u011fan power station","x":297.7,"y":612.3,"cell":4486,"value":630,"detail":"630 MW, opened 1982, Bereket Enerji","state":"48","cbsa":"48","opened":1982},{"type":"coal_plant","name":"\u00c7ay\u0131rhan power station","x":626.1,"y":322.7,"cell":2434,"value":620,"detail":"620 MW, opened 1987, Ciner Enerji","state":"06","cbsa":"06","opened":1987},{"type":"gas_plant","name":"Bandirma 2 Do\u011falgaz Santrali","x":294.6,"y":280.0,"cell":2088,"value":607,"detail":"607 MW, Enerjisa Elektrik","state":"10","cbsa":"10"},{"type":"coal_plant","name":"Seyit\u00f6mer power station","x":468.8,"y":373.7,"cell":2752,"value":600,"detail":"600 MW, opened 1978, \u00c7elikler Elektrik","state":"43","cbsa":"43","opened":1978},{"type":"hydro","name":"Beyhan I Dam","x":1351.8,"y":464.9,"cell":3457,"value":582,"detail":"582 MW, opened 2011","state":"23","cbsa":"23","opened":2011},{"type":"gas_plant","name":"\u0130\u00e7 Anadolu Do\u011falgaz Kombine \u00c7evrim Santrali","x":774.4,"y":364.4,"cell":2661,"value":560,"detail":"560 MW, Gama Enerji","state":"71","cbsa":"71"},{"type":"hydro","name":"Oymapinar Dam","x":598.6,"y":676.6,"cell":4939,"value":540,"detail":"540 MW, opened 1977","state":"07","cbsa":"07","opened":1977},{"type":"hydro","name":"Yusufeli Dam","x":1465.6,"y":227.4,"cell":1719,"value":540,"detail":"540 MW, opened 2022","state":"08","cbsa":"08","opened":2022},{"type":"coal_plant","name":"Kangal power station","x":1105.0,"y":438.7,"cell":3224,"value":537,"detail":"537 MW, opened 1993, Konya \u015eeker Enerji","state":"58","cbsa":"58","opened":1993},{"type":"hydro","name":"Boyabat Dam","x":907.2,"y":189.6,"cell":1469,"value":513,"detail":"513 MW, opened 2008","state":"55","cbsa":"55","opened":2008},{"type":"hydro","name":"Berke Dam","x":1036.1,"y":629.8,"cell":4638,"value":510,"detail":"510 MW, opened 1986","state":"80","cbsa":"80","opened":1986},{"type":"coal_plant","name":"Soma Kolin power station","x":284.1,"y":389.8,"cell":2850,"value":510,"detail":"510 MW, opened 2019","state":"45","cbsa":"45","opened":2019},{"type":"hydro","name":"Hasan U\u011furlu Dam","x":1045.5,"y":233.1,"cell":1695,"value":500,"detail":"500 MW","state":"55","cbsa":"55"},{"type":"hydro","name":"Lower Kalek\u00f6y Dam","x":1400.9,"y":453.1,"cell":3351,"value":500,"detail":"500 MW","state":"12","cbsa":"12"},{"type":"gas_plant","name":"Bursa Do\u011falgaz Termik Santrali","x":394.2,"y":294.9,"cell":2203,"value":486,"detail":"486 MW, Bis Enerji","state":"16","cbsa":"16"},{"type":"gas_plant","name":"Unimar Marmara Ere\u011flisi Do\u011falgaz Kombine \u00c7evrim Santrali","x":317.9,"y":203.8,"cell":1435,"value":478,"detail":"478 MW, Uni-Mar Enerji","state":"59","cbsa":"59"},{"type":"coal_plant","name":"Tufanbeyli power station","x":1017.8,"y":539.7,"cell":3983,"value":450,"detail":"450 MW, opened 2015","state":"01","cbsa":"01","opened":2015},{"type":"coal_plant","name":"Yenik\u00f6y power station","x":275.8,"y":632.0,"cell":4594,"value":420,"detail":"420 MW, opened 1986, IC \u0130\u00e7ta\u015f Enerji","state":"48","cbsa":"48","opened":1986},{"type":"hydro","name":"\u00c7etin Dam","x":1552.6,"y":537.8,"cell":4014,"value":420,"detail":"420 MW, opened 2020","state":"56","cbsa":"56","opened":2020},{"type":"hydro","name":"Pervari Hydroelectric Power Station","x":1576.4,"y":536.9,"cell":4015,"value":409,"detail":"409 MW","state":"56","cbsa":"56"},{"type":"coal_plant","name":"\u015e\u0131rnak Silopi power station","x":1577.7,"y":609.8,"cell":4451,"value":405,"detail":"405 MW, opened 2009","state":"73","cbsa":"73","opened":2009},{"type":"coal_plant","name":"Bekirli\u20111","x":242.0,"y":260.5,"cell":1976,"value":405,"detail":"405 MW, opened 2005","state":"17","cbsa":"17","opened":2005},{"type":"gas_plant","name":"Kazan gas cogeneration power plant","x":694.5,"y":323.9,"cell":2438,"value":379,"detail":"379 MW","state":"06","cbsa":"06"},{"type":"coal_plant","name":"Tun\u00e7bilek K\u00fctahya power station","x":433.3,"y":365.5,"cell":2641,"value":365,"detail":"365 MW, opened 1975, E\u00dcA\u015e","state":"43","cbsa":"43","opened":1975},{"type":"coal_plant","name":"\u0130zdemir Enerji power station","x":208.3,"y":447.6,"cell":3282,"value":350,"detail":"350 MW, opened 2014, \u0130zmir Demir \u00c7elik","state":"35","cbsa":"35","opened":2014},{"type":"hydro","name":"Artvin Dam","x":1475.1,"y":213.7,"cell":1611,"value":340,"detail":"340 MW, opened 2010","state":"08","cbsa":"08","opened":2010},{"type":"coal_plant","name":"\u00c7an-1 power station","x":225.0,"y":305.9,"cell":2193,"value":320,"detail":"320 MW, opened 2003, E\u00dcA\u015e","state":"17","cbsa":"17","opened":2003},{"type":"coal_plant","name":"\u00c7atala\u011fz\u0131-B power station","x":648.8,"y":165.4,"cell":1236,"value":314,"detail":"314 MW, Bereket Enerji","state":"67","cbsa":"67"},{"type":"hydro","name":"Yedig\u00f6ze Dam","x":946.3,"y":627.6,"cell":4633,"value":310,"detail":"310 MW, opened 2007","state":"01","cbsa":"01","opened":2007},{"type":"hydro","name":"Ermenek Hidroelektrik Santrali","x":733.5,"y":717.6,"cell":5274,"value":302,"detail":"302 MW, opened 2002","state":"70","cbsa":"70","opened":2002},{"type":"hydro","name":"Bor\u00e7ka Dam","x":1464.5,"y":167.9,"cell":1283,"value":300,"detail":"300 MW, opened 1999","state":"08","cbsa":"08","opened":1999},{"type":"geothermal","name":"Efeler","x":262.5,"y":550.0,"cell":4048,"value":114,"detail":"114 MW, G\u00fcri\u015f Holding","state":"09","cbsa":"09"},{"type":"geothermal","name":"Kizildere 2","x":367.1,"y":548.4,"cell":4054,"value":80,"detail":"80 MW, opened 2013, Zorlu Enerji","state":"20","cbsa":"20","opened":2013},{"type":"geothermal","name":"Pamuk\u00f6ren","x":340.1,"y":550.2,"cell":4052,"value":68,"detail":"68 MW, opened 2014, \u00c7elikler Enerji","state":"09","cbsa":"09","opened":2014},{"type":"geothermal","name":"Galip Hoca Germencik","x":261.2,"y":547.8,"cell":3939,"value":47,"detail":"47 MW, opened 2009, G\u00fcri\u015f Holding","state":"09","cbsa":"09","opened":2009},{"type":"geothermal","name":"Ala\u015fehir","x":335.3,"y":495.9,"cell":3616,"value":45,"detail":"45 MW, opened 2015, Zorlu Enerji","state":"45","cbsa":"45","opened":2015},{"type":"solar","name":"Kayseri OSB2","x":936.2,"y":482.1,"cell":3542,"value":45,"detail":"45 MW","state":"38","cbsa":"38"},{"type":"solar","name":"Erdemli","x":829.9,"y":722.4,"cell":5280,"value":35,"detail":"35 MW","state":"33","cbsa":"33"},{"type":"solar","name":"Yaln\u0131z B","x":1269.2,"y":484.5,"cell":3561,"value":30,"detail":"30 MW","state":"23","cbsa":"23"},{"type":"solar","name":"Gaziantep\u00a0","x":1094.4,"y":663.6,"cell":4859,"value":25,"detail":"25 MW","state":"27","cbsa":"27"},{"type":"solar","name":"Kula Manisa","x":356.2,"y":475.0,"cell":3509,"value":21,"detail":"21 MW","state":"45","cbsa":"45"},{"type":"wind","name":"Soma RES","x":287.3,"y":391.3,"cell":2851,"value":316,"detail":"316.3 MW, opened 2009/2010/2011/2012/2014/2015/2019/2020/2024, Manisa, position from OpenStreetMap (Soma 4 R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"45","cbsa":"45","opened":2009},{"type":"wind","name":"Lodos Karaburun RES","x":165.6,"y":460.0,"cell":3388,"value":268,"detail":"268 MW, opened 2012/2013/2019/2020/2023, \u0130zmir, position from OpenStreetMap (Karaburun R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2012},{"type":"wind","name":"\u0130stanbul I-II RES","x":346.5,"y":159.0,"cell":1219,"value":211,"detail":"211.2 MW, opened 2020/2021/2022, \u0130stanbul, position from OpenStreetMap (\u0130stanbul RES R\u00fczg\u00e2r T\u00fcrbini), T\u00dcREB list, January 2025","state":"34","cbsa":"34","opened":2020},{"type":"wind","name":"Dinar RES","x":485.5,"y":538.2,"cell":3952,"value":200,"detail":"200.2 MW, opened 2013/2016, Afyon, position from OpenStreetMap (Dinar R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"03","cbsa":"03","opened":2013},{"type":"wind","name":"G\u00fclp\u0131nar RES","x":147.0,"y":353.5,"cell":2625,"value":194,"detail":"193.5 MW, opened 2019/2020/2023/2024, \u00c7anakkale, approximate position: G\u00fclp\u0131nar (village, OpenStreetMap), the place it is named after, T\u00dcREB list, January 2025","state":"17","cbsa":"17","opened":2019,"approx":"place"},{"type":"wind","name":"Evrencik RES","x":301.8,"y":130.8,"cell":998,"value":174,"detail":"174.2 MW, opened 2020/2021/2024, K\u0131rklareli, approximate position: Evrencik (village, OpenStreetMap), the place it is named after, T\u00dcREB list, January 2025","state":"39","cbsa":"39","opened":2020,"approx":"place"},{"type":"wind","name":"Alyel Geycek RES","x":863.5,"y":438.9,"cell":3210,"value":168,"detail":"168 MW, opened 2013/2014, K\u0131r\u015fehir, position from OpenStreetMap (Geycek R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"40","cbsa":"40","opened":2013},{"type":"wind","name":"Tatl\u0131p\u0131nar RES","x":291.7,"y":338.7,"cell":2523,"value":149,"detail":"149.1 MW, opened 2019/2020/2024, Bal\u0131kesir, approximate position: Tatl\u0131p\u0131nar (village, OpenStreetMap), the place it is named after, T\u00dcREB list, January 2025","state":"10","cbsa":"10","opened":2019,"approx":"place"},{"type":"wind","name":"Bal\u0131kesir RES","x":312.9,"y":344.8,"cell":2525,"value":143,"detail":"143 MW, opened 2012, Bal\u0131kesir, position from OpenStreetMap (Bal\u0131kesir R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"10","cbsa":"10","opened":2012},{"type":"wind","name":"Baltaliman\u0131 RES","x":177.4,"y":287.4,"cell":2080,"value":138,"detail":"138 MW, opened 2020, \u00c7anakkale, approximate position: \u00c7anakkale province centre, T\u00dcREB list, January 2025","state":"17","cbsa":"17","opened":2020,"approx":"province"},{"type":"wind","name":"G\u00f6k\u00e7eda\u011f RES","x":1049.6,"y":654.9,"cell":4747,"value":135,"detail":"135 MW, opened 2009, Osmaniye, position from OpenStreetMap (Osmaniye G\u00f6k\u00e7eda\u011f (Rotor) R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"80","cbsa":"80","opened":2009},{"type":"wind","name":"Kangal RES","x":1104.8,"y":447.3,"cell":3334,"value":128,"detail":"128 MW, opened 2014/2015/2017, Sivas, position from OpenStreetMap (Kangal R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"58","cbsa":"58","opened":2014},{"type":"wind","name":"\u015eaml\u0131 RES","x":300.4,"y":323.8,"cell":2415,"value":128,"detail":"127.8 MW, opened 2008/2009/2011/2021, Bal\u0131kesir, position from OpenStreetMap (\u015eaml\u0131 R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"10","cbsa":"10","opened":2008},{"type":"wind","name":"G\u00f6ktepe RES","x":424.4,"y":250.5,"cell":1877,"value":121,"detail":"121.1 MW, opened 2020/2021/2022/2023, Yalova, approximate position: Yalova province centre, T\u00dcREB list, January 2025","state":"77","cbsa":"77","opened":2020,"approx":"province"},{"type":"wind","name":"Ulu RES","x":404.7,"y":301.0,"cell":2203,"value":120,"detail":"120.4 MW, opened 2020/2021/2022, Bursa, approximate position: Bursa province centre, T\u00dcREB list, January 2025","state":"16","cbsa":"16","opened":2020,"approx":"province"},{"type":"wind","name":"Bergama RES","x":236.4,"y":425.9,"cell":3066,"value":120,"detail":"120 MW, opened 2010/2016, \u0130zmir, position from OpenStreetMap (Berg R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2010},{"type":"wind","name":"Ku\u015fadas\u0131 RES","x":229.2,"y":547.5,"cell":4046,"value":120,"detail":"120 MW, opened 2020/2021/2022, Ayd\u0131n, approximate position: Ku\u015fadas\u0131 (town, OpenStreetMap), the place it is named after, T\u00dcREB list, January 2025","state":"09","cbsa":"09","opened":2020,"approx":"place"},{"type":"wind","name":"Soma RES","x":283.6,"y":393.1,"cell":2850,"value":120,"detail":"120 MW, opened 2007/2016, Manisa, position from OpenStreetMap (Soma R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"45","cbsa":"45","opened":2007},{"type":"wind","name":"Zonguldak RES","x":520.0,"y":242.5,"cell":1774,"value":120,"detail":"120 MW, opened 2022, Sakarya, approximate position: Sakarya province centre, T\u00dcREB list, January 2025","state":"54","cbsa":"54","opened":2022,"approx":"province"},{"type":"wind","name":"Geyve RES","x":521.1,"y":267.0,"cell":1992,"value":116,"detail":"115.8 MW, opened 2020/2021/2024, Sakarya, position from OpenStreetMap (Geyve R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"54","cbsa":"54","opened":2020},{"type":"wind","name":"\u00dc\u00e7p\u0131nar RES","x":201.1,"y":290.7,"cell":2082,"value":112,"detail":"112.2 MW, opened 2019, \u00c7anakkale, position from OpenStreetMap (\u00dc\u00e7p\u0131nar R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"17","cbsa":"17","opened":2019},{"type":"wind","name":"Aksu RES","x":949.8,"y":549.3,"cell":4087,"value":105,"detail":"105.5 MW, opened 2012/2019/2024, Kayseri, position from OpenStreetMap (Aksu R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"38","cbsa":"38","opened":2012},{"type":"wind","name":"\u015eahRES","x":333.1,"y":276.4,"cell":2089,"value":105,"detail":"105 MW, opened 2011/2013, Bal\u0131kesir, position from OpenStreetMap (\u015eAH R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"10","cbsa":"10","opened":2011},{"type":"wind","name":"Vize RES","x":304.5,"y":130.4,"cell":1218,"value":105,"detail":"104.8 MW, opened 2020/2021/2024, \u0130stanbul/K\u0131rklareli, position from OpenStreetMap (Vize-2 R\u00fczg\u00e2r Enerjisi Santrali), T\u00dcREB list, January 2025","state":"34","cbsa":"34","opened":2020},{"type":"wind","name":"U\u015fak Extension Project","x":468.7,"y":459.2,"cell":3405,"value":102,"detail":"102 MW, opened 2023/2024, U\u015fak, position from OpenStreetMap (U\u015fak R\u00fczgar Santrali), T\u00dcREB list, January 2025","state":"64","cbsa":"64","opened":2023},{"type":"wind","name":"Atares-2","x":402.5,"y":303.0,"cell":2203,"value":101,"detail":"100.8 MW, opened 2021/2024, Bursa, approximate position: Bursa province centre, T\u00dcREB list, January 2025","state":"16","cbsa":"16","opened":2021,"approx":"province"},{"type":"wind","name":"\u00d6merli RES","x":400.5,"y":209.4,"cell":1550,"value":101,"detail":"100.8 MW, opened 2020/2022, \u0130stanbul, approximate position: \u0130stanbul province centre, T\u00dcREB list, January 2025","state":"34","cbsa":"34","opened":2020,"approx":"province"},{"type":"wind","name":"K\u0131y\u0131k\u00f6y RES","x":330.6,"y":130.5,"cell":999,"value":100,"detail":"100 MW, opened 2014/2020, K\u0131rklareli, position from OpenStreetMap (K\u0131y\u0131k\u00f6y R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"39","cbsa":"39","opened":2014},{"type":"wind","name":"Kocatepe RES","x":519.6,"y":472.2,"cell":3518,"value":100,"detail":"100 MW, opened 2019/2020, Afyon, approximate position: Kocatepe (village, OpenStreetMap), the place it is named after, T\u00dcREB list, January 2025","state":"03","cbsa":"03","opened":2019,"approx":"place"},{"type":"wind","name":"\u00c7atalca RES","x":357.6,"y":190.7,"cell":1437,"value":94,"detail":"94.5 MW, opened 2008/2017, \u0130stanbul, position from OpenStreetMap (\u00c7atalca R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"34","cbsa":"34","opened":2008},{"type":"wind","name":"Tokat RES","x":1038.5,"y":302.5,"cell":2240,"value":94,"detail":"94 MW, opened 2011/2017, Tokat, approximate position: Tokat district centre, T\u00dcREB list, January 2025","state":"60","cbsa":"60","opened":2011,"approx":"district"},{"type":"wind","name":"Cerit RES","x":1112.1,"y":590.1,"cell":4315,"value":93,"detail":"92.7 MW, opened 2018/2020, Kahramanmara\u015f, position from OpenStreetMap (Cerit R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"46","cbsa":"46","opened":2018},{"type":"wind","name":"Boz\u00fcy\u00fck RES","x":483.8,"y":337.4,"cell":2426,"value":92,"detail":"92.5 MW, opened 2021/2022, Bilecik, approximate position: Boz\u00fcy\u00fck (town, OpenStreetMap), the place it is named after, T\u00dcREB list, January 2025","state":"11","cbsa":"11","opened":2021,"approx":"place"},{"type":"wind","name":"Erciyes RES","x":952.4,"y":487.9,"cell":3543,"value":92,"detail":"92 MW, opened 2022/2023, Kayseri, approximate position: Erciyes (neighbourhood, OpenStreetMap), the place it is named after, T\u00dcREB list, January 2025","state":"38","cbsa":"38","opened":2022,"approx":"place"},{"type":"wind","name":"Yahyal\u0131 RES","x":955.0,"y":561.3,"cell":4088,"value":92,"detail":"91.5 MW, opened 2016/2017/2023, Kayseri, position from OpenStreetMap (Yahyal\u0131 R\u00fczgar Santrali), T\u00dcREB list, January 2025","state":"38","cbsa":"38","opened":2016},{"type":"wind","name":"Band\u0131rma RES","x":327.5,"y":276.1,"cell":2089,"value":91,"detail":"91 MW, opened 2009/2010/2014/2015, Bal\u0131kesir, position from OpenStreetMap (Bandirma R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"10","cbsa":"10","opened":2009},{"type":"wind","name":"Mutlu RES 5","x":693.1,"y":541.6,"cell":3964,"value":89,"detail":"88.8 MW, opened 2020/2024, Konya, position from OpenStreetMap (Mutlu R\u00fczgar Elektirik Santrali), T\u00dcREB list, January 2025","state":"42","cbsa":"42","opened":2020},{"type":"wind","name":"Ard\u0131\u00e7l\u0131 RES","x":714.4,"y":542.7,"cell":3965,"value":87,"detail":"86.7 MW, opened 2018/2023/2024, Konya, position from OpenStreetMap (Ard\u0131\u00e7l\u0131 R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"42","cbsa":"42","opened":2018},{"type":"wind","name":"Poyraz RES","x":321.5,"y":344.6,"cell":2525,"value":86,"detail":"85.5 MW, opened 2012/2013/2016/2024, Bal\u0131kesir, position from OpenStreetMap (Poyraz R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"10","cbsa":"10","opened":2012},{"type":"wind","name":"Adapazar\u0131 RES","x":517.8,"y":244.5,"cell":1774,"value":85,"detail":"84.8 MW, opened 2021, Sakarya, approximate position: Adapazar\u0131 (town, OpenStreetMap), the place it is named after, T\u00dcREB list, January 2025","state":"54","cbsa":"54","opened":2021,"approx":"place"},{"type":"wind","name":"Amasya RES","x":1000.5,"y":267.9,"cell":2020,"value":82,"detail":"82 MW, opened 2012/2017, Amasya, position from OpenStreetMap (Amasya R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"05","cbsa":"05","opened":2012},{"type":"wind","name":"Sibel RES","x":241.7,"y":473.9,"cell":3502,"value":81,"detail":"80.8 MW, opened 2020/2021, \u0130zmir, position from OpenStreetMap (Sibel RES), T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2020},{"type":"wind","name":"Fatma RES","x":328.5,"y":626.6,"cell":4597,"value":80,"detail":"80 MW, opened 2016, Mu\u011fla, position from OpenStreetMap (Fatma RES), T\u00dcREB list, January 2025","state":"48","cbsa":"48","opened":2016},{"type":"wind","name":"Ba\u011flar RES","x":705.8,"y":545.2,"cell":3965,"value":79,"detail":"79.2 MW, opened 2018, Konya, position from OpenStreetMap (Ba\u011flar R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"42","cbsa":"42","opened":2018},{"type":"wind","name":"Ta\u015fp\u0131nar RES","x":405.1,"y":296.8,"cell":2203,"value":79,"detail":"79 MW, opened 2020/2021/2023, Bursa, approximate position: Bursa province centre, T\u00dcREB list, January 2025","state":"16","cbsa":"16","opened":2020,"approx":"province"},{"type":"wind","name":"Edincik RES","x":299.6,"y":278.1,"cell":2088,"value":77,"detail":"77.4 MW, opened 2013/2015/2016, Bal\u0131kesir, position from OpenStreetMap (Edincik RES), T\u00dcREB list, January 2025","state":"10","cbsa":"10","opened":2013},{"type":"wind","name":"Ziyaret RES","x":1000.5,"y":771.5,"cell":5616,"value":76,"detail":"76 MW, opened 2010/2011/2013/2014, Hatay, position from OpenStreetMap (Ziyaret (T\u00fcrbe) R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"31","cbsa":"31","opened":2010},{"type":"wind","name":"Susurluk RES","x":312.1,"y":337.6,"cell":2416,"value":75,"detail":"75 MW, opened 2011/2013/2017, Bal\u0131kesir, position from OpenStreetMap (Susurluk RES), T\u00dcREB list, January 2025","state":"10","cbsa":"10","opened":2011},{"type":"wind","name":"Denizli RES","x":388.7,"y":568.4,"cell":4164,"value":75,"detail":"74.8 MW, opened 2019, Denizli, approximate position: Denizli province centre, T\u00dcREB list, January 2025","state":"20","cbsa":"20","opened":2019,"approx":"province"},{"type":"wind","name":"Mersinli RES","x":226.9,"y":483.2,"cell":3501,"value":74,"detail":"74.2 MW, opened 2020/2024, \u0130zmir, approximate position: Mersinli (suburb, OpenStreetMap), the place it is named after, T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2020,"approx":"place"},{"type":"wind","name":"G\u00fcney-1 RES","x":407.9,"y":305.1,"cell":2204,"value":74,"detail":"73.6 MW, opened 2021, Bursa, approximate position: Bursa province centre, T\u00dcREB list, January 2025","state":"16","cbsa":"16","opened":2021,"approx":"province"},{"type":"wind","name":"Atares-1","x":398.8,"y":300.0,"cell":2203,"value":72,"detail":"72 MW, opened 2021/2024, Bursa, approximate position: Bursa province centre, T\u00dcREB list, January 2025","state":"16","cbsa":"16","opened":2021,"approx":"province"},{"type":"wind","name":"Maslaktepe RES","x":175.2,"y":289.4,"cell":2080,"value":71,"detail":"70.6 MW, opened 2019/2022/2023, \u00c7anakkale, approximate position: \u00c7anakkale province centre, T\u00dcREB list, January 2025","state":"17","cbsa":"17","opened":2019,"approx":"province"},{"type":"wind","name":"BergRES","x":234.2,"y":427.9,"cell":3174,"value":70,"detail":"70 MW, opened 2017, \u0130zmir, position from OpenStreetMap (Berg R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2017},{"type":"wind","name":"Hac\u0131bey RES","x":398.3,"y":211.4,"cell":1548,"value":70,"detail":"69.6 MW, opened 2020/2022, \u0130stanbul, approximate position: \u0130stanbul province centre, T\u00dcREB list, January 2025","state":"34","cbsa":"34","opened":2020,"approx":"province"},{"type":"wind","name":"Gazi-9 RES","x":177.8,"y":283.2,"cell":2080,"value":67,"detail":"67.2 MW, opened 2021, \u00c7anakkale, approximate position: \u00c7anakkale province centre, T\u00dcREB list, January 2025","state":"17","cbsa":"17","opened":2021,"approx":"province"},{"type":"wind","name":"Sule RES Project","x":516.1,"y":577.5,"cell":4172,"value":66,"detail":"66 MW, opened 2025, Isparta/Konya, approximate position: Isparta province centre, T\u00dcREB list, January 2025","state":"32","cbsa":"32","opened":2025,"approx":"province"},{"type":"wind","name":"S\u00fclo\u011flu RES","x":226.7,"y":90.8,"cell":668,"value":66,"detail":"66 MW, opened 2015, K\u0131rklareli, position from OpenStreetMap (S\u00fclo\u011flu R\u00fczgar Enerjisi Santrali), T\u00dcREB list, January 2025","state":"39","cbsa":"39","opened":2015},{"type":"wind","name":"Kartalda\u011f\u0131 RES","x":1079.9,"y":655.9,"cell":4858,"value":66,"detail":"65.5 MW, opened 2017, Gaziantep, position from OpenStreetMap (Kartalda\u011f\u0131 RES), T\u00dcREB list, January 2025","state":"27","cbsa":"27","opened":2017},{"type":"wind","name":"Kanije RES","x":228.1,"y":182.9,"cell":1321,"value":64,"detail":"64 MW, opened 2016, Edirne, position from OpenStreetMap (Kanije R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"22","cbsa":"22","opened":2016},{"type":"wind","name":"Alize \u00c7amseki RES","x":156.4,"y":314.6,"cell":2298,"value":63,"detail":"63.1 MW, opened 2008/2009/2018, \u00c7anakkale, position from OpenStreetMap (\u00c7amseki R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"17","cbsa":"17","opened":2008},{"type":"wind","name":"Silivri RES","x":345.5,"y":188.9,"cell":1328,"value":63,"detail":"63 MW, opened 2014/2018/2019, \u0130stanbul, position from OpenStreetMap (Silivri RES), T\u00dcREB list, January 2025","state":"34","cbsa":"34","opened":2014},{"type":"wind","name":"Mersin Mut RES","x":751.7,"y":701.2,"cell":5166,"value":63,"detail":"62.7 MW, opened 2010/2013/2017, Mersin, position from OpenStreetMap (Mut R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"33","cbsa":"33","opened":2010},{"type":"wind","name":"Balabanl\u0131 RES","x":289.8,"y":191.2,"cell":1433,"value":61,"detail":"61.4 MW, opened 2014/2016, Tekirda\u011f, position from OpenStreetMap (Balabanl\u0131 R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"59","cbsa":"59","opened":2014},{"type":"wind","name":"Uluborlu RES","x":506.3,"y":543.9,"cell":3953,"value":61,"detail":"61.2 MW, opened 2016, Isparta, position from OpenStreetMap (Uluborlu R\u00fczgar Santrali), T\u00dcREB list, January 2025","state":"32","cbsa":"32","opened":2016},{"type":"wind","name":"AirRES-4","x":310.1,"y":136.7,"cell":998,"value":61,"detail":"60.8 MW, opened 2017, K\u0131rklareli, position from OpenStreetMap (Airres-4 R\u00fczgar Enerjisi Santrali), T\u00dcREB list, January 2025","state":"39","cbsa":"39","opened":2017},{"type":"wind","name":"Biga RES","x":247.6,"y":263.4,"cell":1976,"value":61,"detail":"60.8 MW, opened 2015, \u00c7anakkale, position from OpenStreetMap (\u0130\u00e7da\u015f Biga RES), T\u00dcREB list, January 2025","state":"17","cbsa":"17","opened":2015},{"type":"wind","name":"Akyel RES","x":686.9,"y":572.2,"cell":4182,"value":60,"detail":"60.2 MW, opened 2020/2024, Konya/Karaman, approximate position: Konya province centre, T\u00dcREB list, January 2025","state":"42","cbsa":"42","opened":2020,"approx":"province"},{"type":"wind","name":"Sebenoba RES","x":997.7,"y":777.1,"cell":5726,"value":60,"detail":"60 MW, opened 2008/2009/2012/2014/2015, Hatay, position from OpenStreetMap (Sebenoba RES), T\u00dcREB list, January 2025","state":"31","cbsa":"31","opened":2008},{"type":"wind","name":"Yuntda\u011f RES","x":232.8,"y":430.0,"cell":3174,"value":60,"detail":"60 MW, opened 2008/2011/2014, \u0130zmir, position from OpenStreetMap (Yuntda\u011f R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2008},{"type":"wind","name":"Bilecik YEKA 3 RES","x":480.7,"y":310.8,"cell":2316,"value":59,"detail":"58.8 MW, opened 2024, Bilecik, approximate position: Bilecik district centre, T\u00dcREB list, January 2025","state":"11","cbsa":"11","opened":2024,"approx":"district"},{"type":"wind","name":"Do\u011fal Sayalar RES","x":297.8,"y":393.6,"cell":2851,"value":57,"detail":"57.2 MW, opened 2007/2008/2013, Manisa, position from OpenStreetMap (Sayalar R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"45","cbsa":"45","opened":2007},{"type":"wind","name":"\u00c7er\u00e7ikaya RES","x":1007.1,"y":736.2,"cell":5399,"value":57,"detail":"57 MW, opened 2015, Hatay, position from OpenStreetMap (\u00c7er\u00e7ikaya R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"31","cbsa":"31","opened":2015},{"type":"wind","name":"Sar\u0131tepe RES","x":1017.8,"y":663.2,"cell":4855,"value":57,"detail":"57 MW, opened 2016, Osmaniye, approximate position: Osmaniye province centre, T\u00dcREB list, January 2025","state":"80","cbsa":"80","opened":2016,"approx":"province"},{"type":"wind","name":"Mare Manast\u0131r RES","x":165.5,"y":495.0,"cell":3606,"value":56,"detail":"56.2 MW, opened 2006/2007/2016, \u0130zmir, position from OpenStreetMap (Mare Manast\u0131r R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2006},{"type":"wind","name":"Havza RES","x":962.8,"y":230.9,"cell":1690,"value":56,"detail":"56 MW, opened 2019/2020, Samsun, approximate position: Havza (town, OpenStreetMap), the place it is named after, T\u00dcREB list, January 2025","state":"55","cbsa":"55","opened":2019,"approx":"place"},{"type":"wind","name":"Anemon Intepe I-II-III RES","x":180.6,"y":291.5,"cell":2191,"value":56,"detail":"55.7 MW, opened 2006/2007/2014/2016, \u00c7anakkale, approximate position: \u00c7anakkale province centre, T\u00dcREB list, January 2025","state":"17","cbsa":"17","opened":2006,"approx":"province"},{"type":"wind","name":"Harmanl\u0131k RES","x":359.4,"y":280.8,"cell":2091,"value":55,"detail":"55.2 MW, opened 2015, Bursa, position from OpenStreetMap (Harmanl\u0131k R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"16","cbsa":"16","opened":2015},{"type":"wind","name":"Mut RES","x":749.5,"y":703.2,"cell":5166,"value":55,"detail":"55.2 MW, opened 2015, Mersin, position from OpenStreetMap (Mut R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"33","cbsa":"33","opened":2015},{"type":"wind","name":"Koru RES","x":210.6,"y":281.8,"cell":2083,"value":55,"detail":"55 MW, opened 2015, \u00c7anakkale, position from OpenStreetMap (Koru R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"17","cbsa":"17","opened":2015},{"type":"wind","name":"Akres","x":250.1,"y":465.7,"cell":3393,"value":55,"detail":"55 MW, opened 2011/2018, Manisa, approximate position: Manisa province centre, T\u00dcREB list, January 2025","state":"45","cbsa":"45","opened":2011,"approx":"province"},{"type":"wind","name":"Ovac\u0131k RES","x":171.5,"y":286.4,"cell":2080,"value":55,"detail":"54.6 MW, opened 2024, \u00c7anakkale, approximate position: \u00c7anakkale province centre, T\u00dcREB list, January 2025","state":"17","cbsa":"17","opened":2024,"approx":"province"},{"type":"wind","name":"K\u0131n\u0131k RES","x":250.0,"y":416.0,"cell":3066,"value":54,"detail":"54.4 MW, opened 2016, \u0130zmir, position from OpenStreetMap (K\u0131n\u0131k R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2016},{"type":"wind","name":"Gaziosmanpa\u015fa RES","x":337.7,"y":173.4,"cell":1218,"value":54,"detail":"54 MW, opened 2020, \u0130stanbul, position from OpenStreetMap (Gaziosmanpa\u015fa RES TM R\u00fczgar T\u00fcrbini), T\u00dcREB list, January 2025","state":"34","cbsa":"34","opened":2020},{"type":"wind","name":"U\u015fak RES","x":466.5,"y":461.2,"cell":3405,"value":54,"detail":"54 MW, opened 2013, U\u015fak, position from OpenStreetMap (U\u015fak R\u00fczgar Santrali), T\u00dcREB list, January 2025","state":"64","cbsa":"64","opened":2013},{"type":"wind","name":"Yalova RES","x":392.9,"y":260.1,"cell":1985,"value":54,"detail":"54 MW, opened 2016, Yalova, position from OpenStreetMap (Yalova R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"77","cbsa":"77","opened":2016},{"type":"wind","name":"Ba\u011flama RES","x":1587.6,"y":496.8,"cell":3688,"value":53,"detail":"53.2 MW, opened 2021, Van, position from OpenStreetMap (Ba\u011flama R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"65","cbsa":"65","opened":2021},{"type":"wind","name":"Yalova RES","x":390.7,"y":262.1,"cell":1985,"value":53,"detail":"53.2 MW, opened 2021, Yalova, position from OpenStreetMap (Yalova R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"77","cbsa":"77","opened":2021},{"type":"wind","name":"Kand\u0131ra RES","x":500.7,"y":208.7,"cell":1555,"value":53,"detail":"53 MW, opened 2021, Kocaeli, approximate position: Kand\u0131ra (town, OpenStreetMap), the place it is named after, T\u00dcREB list, January 2025","state":"41","cbsa":"41","opened":2021,"approx":"place"},{"type":"wind","name":"Kirazl\u0131 RES","x":331.2,"y":529.4,"cell":3833,"value":53,"detail":"53 MW, opened 2020, \u0130zmir, position from OpenStreetMap (Kirazl\u0131 R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2020},{"type":"wind","name":"Kartal RES","x":603.3,"y":343.0,"cell":2541,"value":53,"detail":"52.8 MW, opened 2020/2021, Eski\u015fehir, approximate position: Kartal Tepesi (peak, OpenStreetMap), the place it is named after, T\u00dcREB list, January 2025","state":"26","cbsa":"26","opened":2020,"approx":"place"},{"type":"wind","name":"Kavakl\u0131 RES","x":296.5,"y":346.1,"cell":2524,"value":53,"detail":"52.8 MW, opened 2014, Bal\u0131kesir, position from OpenStreetMap (Kavakl\u0131 R\u00fczgar Santrali), T\u00dcREB list, January 2025","state":"10","cbsa":"10","opened":2014},{"type":"wind","name":"Yahyal\u0131 RES","x":952.8,"y":563.3,"cell":4197,"value":53,"detail":"52.8 MW, opened 2015, Kayseri, position from OpenStreetMap (Yahyal\u0131 R\u00fczgar Santrali), T\u00dcREB list, January 2025","state":"38","cbsa":"38","opened":2015},{"type":"wind","name":"Akb\u00fck RES","x":236.1,"y":594.4,"cell":4264,"value":52,"detail":"52.5 MW, opened 2009/2016, Ayd\u0131n/Mu\u011fla, position from OpenStreetMap (Akb\u00fck R\u00fczgar Santrali), T\u00dcREB list, January 2025","state":"09","cbsa":"09","opened":2009},{"type":"wind","name":"Band\u0131rma RES","x":321.6,"y":275.6,"cell":2089,"value":52,"detail":"51.5 MW, opened 2006/2012/2015, Bal\u0131kesir, position from OpenStreetMap (Band\u0131rma R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"10","cbsa":"10","opened":2006},{"type":"wind","name":"D\u00fczova RES","x":219.7,"y":415.2,"cell":3065,"value":52,"detail":"51.5 MW, opened 2009/2010/2012/2013/2014, \u0130zmir, position from OpenStreetMap (D\u00fczova RES), T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2009},{"type":"wind","name":"\u015eile RES","x":456.2,"y":194.6,"cell":1442,"value":51,"detail":"51.2 MW, opened 2021, \u0130stanbul, approximate position: \u015eile (town, OpenStreetMap), the place it is named after, T\u00dcREB list, January 2025","state":"34","cbsa":"34","opened":2021,"approx":"place"},{"type":"wind","name":"Cerke\u015f RES","x":711.2,"y":251.2,"cell":1894,"value":51,"detail":"51 MW, opened 2021/2022, \u00c7ank\u0131r\u0131, position from OpenStreetMap (\u00c7ank\u0131r\u0131 \u00c7erke\u015f R\u00fczgar Santrali G\u00fc\u00e7 Da\u011f\u0131t\u0131m \u0130stasyonu), T\u00dcREB list, January 2025","state":"18","cbsa":"18","opened":2021},{"type":"wind","name":"Hasanoba RES","x":183.2,"y":351.7,"cell":2517,"value":51,"detail":"51 MW, opened 2019, \u00c7anakkale, approximate position: Hasanoba (neighbourhood, OpenStreetMap), the place it is named after, T\u00dcREB list, January 2025","state":"17","cbsa":"17","opened":2019,"approx":"place"},{"type":"wind","name":"Petkim RES","x":207.0,"y":439.9,"cell":3282,"value":51,"detail":"51 MW, opened 2016, \u0130zmir, position from OpenStreetMap (Petkim R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2016},{"type":"wind","name":"Tire RES","x":271.9,"y":525.8,"cell":3830,"value":51,"detail":"50.9 MW, opened 2017/2018, \u0130zmir, approximate position: Tire (town, OpenStreetMap), the place it is named after, T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2017,"approx":"place"},{"type":"wind","name":"Bafa RES","x":279.6,"y":553.3,"cell":4049,"value":51,"detail":"50.8 MW, opened 2020/2024, Ayd\u0131n, approximate position: Ayd\u0131n province centre, T\u00dcREB list, January 2025","state":"09","cbsa":"09","opened":2020,"approx":"province"},{"type":"wind","name":"I\u015f\u0131klar RES","x":476.5,"y":390.8,"cell":2862,"value":51,"detail":"50.8 MW, opened 2024, K\u00fctahya, approximate position: K\u00fctahya province centre, T\u00dcREB list, January 2025","state":"43","cbsa":"43","opened":2024,"approx":"province"},{"type":"wind","name":"Ankara RES","x":834.6,"y":433.4,"cell":3209,"value":50,"detail":"50.4 MW, opened 2024, K\u0131r\u015fehir, approximate position: K\u0131r\u015fehir province centre, T\u00dcREB list, January 2025","state":"40","cbsa":"40","opened":2024,"approx":"province"},{"type":"wind","name":"Kurtkayas\u0131 RES","x":949.2,"y":480.6,"cell":3543,"value":50,"detail":"50.4 MW, opened 2016/2022, Kayseri, approximate position: Kayseri province centre, T\u00dcREB list, January 2025","state":"38","cbsa":"38","opened":2016,"approx":"province"},{"type":"wind","name":"Yenik\u00f6y RES","x":183.1,"y":283.8,"cell":2082,"value":50,"detail":"50.4 MW, opened 2020, \u00c7anakkale, approximate position: \u00c7anakkale province centre, T\u00dcREB list, January 2025","state":"17","cbsa":"17","opened":2020,"approx":"province"},{"type":"wind","name":"Alize Kuyucak RES","x":291.2,"y":398.0,"cell":2851,"value":50,"detail":"50.3 MW, opened 2010/2015/2017, Manisa, approximate position: Kuyucak (village, OpenStreetMap), the place it is named after, T\u00dcREB list, January 2025","state":"45","cbsa":"45","opened":2010,"approx":"place"},{"type":"wind","name":"Hasanbeyli RES","x":1045.9,"y":663.4,"cell":4856,"value":50,"detail":"50 MW, opened 2014, Osmaniye, position from OpenStreetMap (Hasanbeyli R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"80","cbsa":"80","opened":2014},{"type":"wind","name":"Tayakad\u0131n RES","x":337.1,"y":165.0,"cell":1218,"value":50,"detail":"50 MW, opened 2021, \u0130stanbul, position from OpenStreetMap (Tayakad\u0131n R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"34","cbsa":"34","opened":2021},{"type":"wind","name":"Zeytineli RES","x":164.3,"y":498.9,"cell":3606,"value":50,"detail":"50 MW, opened 2013, \u0130zmir, position from OpenStreetMap (Zeytineli R\u00fczgar Santrali), T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2013},{"type":"wind","name":"Metafor RES","x":1410.8,"y":405.8,"cell":3024,"value":50,"detail":"49.7 MW, opened 2020/2022, Bing\u00f6l, position from OpenStreetMap (Metafor R\u00fczg\u00e2r Enerji Santrali), T\u00dcREB list, January 2025","state":"12","cbsa":"12","opened":2020},{"type":"wind","name":"S\u00f6ke RES","x":238.8,"y":565.9,"cell":4156,"value":50,"detail":"49.5 MW, opened 2015, Ayd\u0131n, position from OpenStreetMap (S\u00f6ke R\u00fczgar Enerjisi Santrali), T\u00dcREB list, January 2025","state":"09","cbsa":"09","opened":2015},{"type":"wind","name":"\u015eapda\u011f\u0131 RES","x":298.7,"y":353.6,"cell":2633,"value":49,"detail":"49.4 MW, opened 2021, Bal\u0131kesir, approximate position: Bal\u0131kesir province centre, T\u00dcREB list, January 2025","state":"10","cbsa":"10","opened":2021,"approx":"province"},{"type":"wind","name":"Poyrazg\u00f6l\u00fc RES","x":319.3,"y":346.6,"cell":2525,"value":48,"detail":"48.5 MW, opened 2015/2018, Bal\u0131kesir, position from OpenStreetMap (Poyraz R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"10","cbsa":"10","opened":2015},{"type":"wind","name":"Amasya RES","x":998.3,"y":269.9,"cell":2020,"value":48,"detail":"48.3 MW, opened 2016, Amasya, position from OpenStreetMap (Amasya R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"05","cbsa":"05","opened":2016},{"type":"wind","name":"Ba\u011faras\u0131 RES","x":263.1,"y":566.6,"cell":3940,"value":48,"detail":"48 MW, opened 2015, \u0130zmir, position from OpenStreetMap (Ba\u011faras\u0131 R\u00fczgar Santrali), T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2015},{"type":"wind","name":"Belen RES","x":1014.6,"y":729.7,"cell":5399,"value":48,"detail":"48 MW, opened 2009, Hatay, position from OpenStreetMap (Belen R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"31","cbsa":"31","opened":2009},{"type":"wind","name":"\u00c7anta RES Extension","x":325.9,"y":190.9,"cell":1327,"value":48,"detail":"47.5 MW, opened 2014, \u0130stanbul, position from OpenStreetMap (\u00c7anta RES), T\u00dcREB list, January 2025","state":"34","cbsa":"34","opened":2014},{"type":"wind","name":"Karaman RES","x":748.9,"y":650.4,"cell":4730,"value":47,"detail":"46.8 MW, opened 2021/2024, Karaman, approximate position: Karaman district centre, T\u00dcREB list, January 2025","state":"70","cbsa":"70","opened":2021,"approx":"district"},{"type":"wind","name":"K\u0131rka\u011fa\u00e7 RES","x":274.2,"y":416.3,"cell":3068,"value":46,"detail":"45.6 MW, opened 2016, Manisa, position from OpenStreetMap (K\u0131rka\u011fa\u00e7 R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"45","cbsa":"45","opened":2016},{"type":"wind","name":"Pazark\u00f6y RES","x":296.5,"y":355.6,"cell":2633,"value":46,"detail":"45.6 MW, opened 2021, Bal\u0131kesir, approximate position: Bal\u0131kesir province centre, T\u00dcREB list, January 2025","state":"10","cbsa":"10","opened":2021,"approx":"province"},{"type":"wind","name":"K\u0131y\u0131k\u00f6y RES","x":326.0,"y":147.9,"cell":1109,"value":45,"detail":"45 MW, opened 2015, Tekirda\u011f, position from OpenStreetMap (K\u0131y\u0131k\u00f6y R\u00fczgar Enerji Santrali 2), T\u00dcREB list, January 2025","state":"59","cbsa":"59","opened":2015},{"type":"wind","name":"\u00c7ak\u0131l RES","x":422.2,"y":252.5,"cell":1877,"value":44,"detail":"44.5 MW, opened 2019/2020, Yalova, approximate position: Yalova province centre, T\u00dcREB list, January 2025","state":"77","cbsa":"77","opened":2019,"approx":"province"},{"type":"wind","name":"Alibey RES","x":314.5,"y":330.5,"cell":2416,"value":44,"detail":"44.4 MW, opened 2018/2023/2024, Bal\u0131kesir, approximate position: Alibey (village, OpenStreetMap), the place it is named after, T\u00dcREB list, January 2025","state":"10","cbsa":"10","opened":2018,"approx":"place"},{"type":"wind","name":"Do\u011fal Samurlu RES","x":222.1,"y":451.1,"cell":3283,"value":44,"detail":"43.9 MW, opened 2012/2013/2017, \u0130zmir, position from OpenStreetMap (Samurlu R\u00fczgar Enerjisi Santrali), T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2012},{"type":"wind","name":"Atakale RES","x":780.1,"y":355.1,"cell":2661,"value":43,"detail":"43.2 MW, opened 2020/2021, K\u0131r\u0131kkale, approximate position: K\u0131r\u0131kkale province centre, T\u00dcREB list, January 2025","state":"71","cbsa":"71","opened":2020,"approx":"province"},{"type":"wind","name":"Kap\u0131da\u011f RES","x":290.1,"y":259.0,"cell":2087,"value":42,"detail":"42.4 MW, opened 2013/2014/2021, Bal\u0131kesir, position from OpenStreetMap (Kap\u0131da\u011f RES), T\u00dcREB list, January 2025","state":"10","cbsa":"10","opened":2013},{"type":"wind","name":"Elaz\u0131\u011f RES","x":1273.7,"y":477.7,"cell":3562,"value":42,"detail":"42 MW, opened 2024, Elaz\u0131\u011f, approximate position: Elaz\u0131\u011f district centre, T\u00dcREB list, January 2025","state":"23","cbsa":"23","opened":2024,"approx":"district"},{"type":"wind","name":"ORDU RES","x":1148.9,"y":225.4,"cell":1701,"value":42,"detail":"42 MW, opened 2024, Ordu, approximate position: Ordu province centre, T\u00dcREB list, January 2025","state":"52","cbsa":"52","opened":2024,"approx":"province"},{"type":"wind","name":"\u00d6demi\u015f RES","x":294.4,"y":512.1,"cell":3723,"value":42,"detail":"42 MW, opened 2015/2016, \u0130zmir, approximate position: \u00d6demi\u015f (town, OpenStreetMap), the place it is named after, T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2015,"approx":"place"},{"type":"wind","name":"YEKA-2/ Harmanc\u0131k RES","x":207.9,"y":291.0,"cell":2192,"value":42,"detail":"42 MW, opened 2024, \u00c7anakkale, approximate position: Harmanc\u0131k (village, OpenStreetMap), the place it is named after, T\u00dcREB list, January 2025","state":"17","cbsa":"17","opened":2024,"approx":"place"},{"type":"wind","name":"Band\u0131rma-3 RES","x":301.2,"y":284.3,"cell":2088,"value":42,"detail":"41.8 MW, opened 2008/2016, Bal\u0131kesir, position from OpenStreetMap (Band\u0131rma-3 RES TM), T\u00dcREB list, January 2025","state":"10","cbsa":"10","opened":2008},{"type":"wind","name":"Dares Datca RES","x":260.3,"y":670.8,"cell":4919,"value":42,"detail":"41.6 MW, opened 2008/2009/2017, Mu\u011fla, position from OpenStreetMap (Dat\u00e7a R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"48","cbsa":"48","opened":2008},{"type":"wind","name":"Doruk Seyitali RES","x":223.2,"y":485.6,"cell":3501,"value":42,"detail":"41.5 MW, opened 2011/2015/2016, \u0130zmir, approximate position: \u0130zmir province centre, T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2011,"approx":"province"},{"type":"wind","name":"Demircili RES","x":221.0,"y":487.6,"cell":3609,"value":40,"detail":"40 MW, opened 2016, \u0130zmir, approximate position: \u0130zmir province centre, T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2016,"approx":"province"},{"type":"wind","name":"Metristepe RES","x":495.6,"y":335.3,"cell":2427,"value":40,"detail":"40 MW, opened 2011, Bilecik, position from OpenStreetMap (Metristepe R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"11","cbsa":"11","opened":2011},{"type":"wind","name":"Da\u011fpazar\u0131 RES","x":765.7,"y":697.0,"cell":5058,"value":39,"detail":"39 MW, opened 2011, Mersin, position from OpenStreetMap (Da\u011fpazar\u0131 R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"33","cbsa":"33","opened":2011},{"type":"wind","name":"Eber RES","x":504.9,"y":495.2,"cell":3626,"value":39,"detail":"39 MW, opened 2018, Afyon, position from OpenStreetMap (Eber R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"03","cbsa":"03","opened":2018},{"type":"wind","name":"\u015ead\u0131ll\u0131 RES","x":226.3,"y":224.9,"cell":1757,"value":38,"detail":"38.5 MW, opened 2014, \u00c7anakkale, position from OpenStreetMap (\u015ead\u0131ll\u0131 RES R\u00fczg\u00e2r T\u00fcrbini), T\u00dcREB list, January 2025","state":"17","cbsa":"17","opened":2014},{"type":"wind","name":"\u015eenb\u00fck RES","x":1016.6,"y":733.6,"cell":5399,"value":38,"detail":"38.2 MW, opened 2010/2014, Hatay, position from OpenStreetMap (\u015eenb\u00fck R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"31","cbsa":"31","opened":2010},{"type":"wind","name":"Hamsi RES","x":919.4,"y":113.2,"cell":924,"value":38,"detail":"37.8 MW, opened 2021/2022, Sinop, approximate position: Sinop province centre, T\u00dcREB list, January 2025","state":"57","cbsa":"57","opened":2021,"approx":"province"},{"type":"wind","name":"Umurlar RES","x":299.1,"y":349.4,"cell":2524,"value":38,"detail":"37.6 MW, opened 2014/2017, Bal\u0131kesir, approximate position: Bal\u0131kesir province centre, T\u00dcREB list, January 2025","state":"10","cbsa":"10","opened":2014,"approx":"province"},{"type":"wind","name":"Ak\u00e7a RES","x":223.6,"y":481.4,"cell":3501,"value":37,"detail":"36.9 MW, opened 2020/2023, \u0130zmir, approximate position: \u0130zmir province centre, T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2020,"approx":"province"},{"type":"wind","name":"\u00c7am\u0131nba\u015f\u0131 RES","x":684.7,"y":574.2,"cell":4182,"value":37,"detail":"36.5 MW, opened 2020/2024, Konya, approximate position: Konya province centre, T\u00dcREB list, January 2025","state":"42","cbsa":"42","opened":2020,"approx":"province"},{"type":"wind","name":"K\u00fcrekda\u011f\u0131 RES","x":403.7,"y":260.0,"cell":1986,"value":36,"detail":"36 MW, opened 2017, Bursa, position from OpenStreetMap (K\u00fcrekda\u011f\u0131 RES), T\u00dcREB list, January 2025","state":"16","cbsa":"16","opened":2017},{"type":"wind","name":"\u015eenk\u00f6y RES","x":1008.4,"y":777.6,"cell":5726,"value":36,"detail":"36 MW, opened 2012/2014, Hatay, position from OpenStreetMap (\u015eenk\u00f6y R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"31","cbsa":"31","opened":2012},{"type":"wind","name":"G\u00f6kRES","x":247.9,"y":467.7,"cell":3393,"value":36,"detail":"35.8 MW, opened 2014, Manisa, approximate position: Manisa province centre, T\u00dcREB list, January 2025","state":"45","cbsa":"45","opened":2014,"approx":"province"},{"type":"wind","name":"Karl\u0131tepe RES","x":1011.1,"y":760.3,"cell":5617,"value":35,"detail":"35 MW, opened 2020, Hatay, approximate position: Hatay province centre, T\u00dcREB list, January 2025","state":"31","cbsa":"31","opened":2020,"approx":"province"},{"type":"wind","name":"\u00d6zbek RES","x":1002.5,"y":768.6,"cell":5616,"value":35,"detail":"34.7 MW, opened 2020/2021/2024, Hatay, approximate position: \u00d6zbek (village, OpenStreetMap), the place it is named after, T\u00dcREB list, January 2025","state":"31","cbsa":"31","opened":2020,"approx":"place"},{"type":"wind","name":"Do\u011fal Kozbeyli RES","x":203.0,"y":450.6,"cell":3282,"value":35,"detail":"34.5 MW, opened 2012/2013/2017, \u0130zmir, position from OpenStreetMap (Kozbeyli R\u00fczgar Enerjisi Santrali), T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2012},{"type":"wind","name":"Seferihisar RES","x":190.8,"y":504.2,"cell":3608,"value":34,"detail":"34.5 MW, opened 2016/2023, \u0130zmir, position from OpenStreetMap (Seferihisar R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2016},{"type":"wind","name":"Fuat RES","x":255.0,"y":497.2,"cell":3611,"value":34,"detail":"33.9 MW, opened 2015/2017, \u0130zmir, position from OpenStreetMap (Fuat R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2015},{"type":"wind","name":"Yakaa\u011fz\u0131 RES","x":1594.6,"y":339.0,"cell":2490,"value":34,"detail":"33.6 MW, opened 2021/2023, A\u011fr\u0131, approximate position: A\u011fr\u0131 province centre, T\u00dcREB list, January 2025","state":"04","cbsa":"04","opened":2021,"approx":"province"},{"type":"wind","name":"Andoz RES","x":935.8,"y":673.8,"cell":4959,"value":33,"detail":"33.4 MW, opened 2020/2021/2022, Adana, approximate position: Adana province centre, T\u00dcREB list, January 2025","state":"01","cbsa":"01","opened":2020,"approx":"province"},{"type":"wind","name":"Kemerburgaz RES","x":332.2,"y":163.8,"cell":1218,"value":33,"detail":"33 MW, opened 2022, \u0130stanbul, position from OpenStreetMap (Kemerburgaz R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"34","cbsa":"34","opened":2022},{"type":"wind","name":"Yama\u00e7tepe RES","x":343.8,"y":175.9,"cell":1328,"value":33,"detail":"33 MW, opened 2019, \u0130stanbul, position from OpenStreetMap (Yama\u00e7tepe-2 R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"34","cbsa":"34","opened":2019},{"type":"wind","name":"Sarp\u0131nc\u0131k RES","x":161.9,"y":453.3,"cell":3388,"value":32,"detail":"32.5 MW, opened 2017, \u0130zmir, position from OpenStreetMap (Sarp\u0131nc\u0131k R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2017},{"type":"wind","name":"Esenk\u00f6y RES","x":397.4,"y":252.7,"cell":1876,"value":32,"detail":"32.4 MW, opened 2017, Yalova, approximate position: Esenk\u00f6y (village, OpenStreetMap), the place it is named after, T\u00dcREB list, January 2025","state":"77","cbsa":"77","opened":2017,"approx":"place"},{"type":"wind","name":"Bereketli RES","x":1105.4,"y":274.0,"cell":2134,"value":32,"detail":"32 MW, opened 2016, Tokat, position from OpenStreetMap (Bereketli R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"60","cbsa":"60","opened":2016},{"type":"wind","name":"Meryem RES","x":488.3,"y":305.0,"cell":2208,"value":32,"detail":"32 MW, opened 2020, Bilecik, position from OpenStreetMap (Meryem R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"11","cbsa":"11","opened":2020},{"type":"wind","name":"Poyraz RES","x":333.9,"y":328.0,"cell":2417,"value":32,"detail":"32 MW, opened 2016, Bal\u0131kesir, position from OpenStreetMap (NM Enerji Poyraz R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"10","cbsa":"10","opened":2016},{"type":"wind","name":"Sertavul RES","x":872.8,"y":694.5,"cell":5064,"value":32,"detail":"32 MW, opened 2020, Mersin, approximate position: Mersin province centre, T\u00dcREB list, January 2025","state":"33","cbsa":"33","opened":2020,"approx":"province"},{"type":"wind","name":"So\u011fanl\u0131 RES","x":1347.1,"y":269.8,"cell":2040,"value":32,"detail":"32 MW, opened 2021, Bayburt, position from OpenStreetMap (So\u011fanl\u0131 R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"69","cbsa":"69","opened":2021},{"type":"wind","name":"Mordo\u011fan RES","x":175.5,"y":468.9,"cell":3498,"value":32,"detail":"31.5 MW, opened 2014, \u0130zmir, position from OpenStreetMap (Mordo\u011fan R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2014},{"type":"wind","name":"Kocalar RES","x":210.1,"y":294.7,"cell":2192,"value":31,"detail":"30.6 MW, opened 2019, \u00c7anakkale, position from OpenStreetMap (Kocalar R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"17","cbsa":"17","opened":2019},{"type":"wind","name":"Gelibolu RES","x":203.0,"y":261.3,"cell":1974,"value":30,"detail":"30.4 MW, opened 2021, \u00c7anakkale, approximate position: Gelibolu (town, OpenStreetMap), the place it is named after, T\u00dcREB list, January 2025","state":"17","cbsa":"17","opened":2021,"approx":"place"},{"type":"wind","name":"Karova RES","x":255.4,"y":640.0,"cell":4701,"value":30,"detail":"30.1 MW, opened 2018, Mu\u011fla, position from OpenStreetMap (Karova R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"48","cbsa":"48","opened":2018},{"type":"wind","name":"Alize Sar\u0131kaya RES","x":232.4,"y":239.8,"cell":1758,"value":30,"detail":"30 MW, opened 2009, Tekirda\u011f, position from OpenStreetMap (Sar\u0131kaya R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"59","cbsa":"59","opened":2009},{"type":"wind","name":"Beyyurdu RES Project","x":937.9,"y":343.0,"cell":2561,"value":30,"detail":"30 MW, opened 2024, Yozgat, approximate position: Beyyurdu (village, OpenStreetMap), the place it is named after, T\u00dcREB list, January 2025","state":"66","cbsa":"66","opened":2024,"approx":"place"},{"type":"wind","name":"Elmal\u0131 RES","x":785.2,"y":750.2,"cell":5495,"value":30,"detail":"30 MW, opened 2016, Mersin, position from OpenStreetMap (Elmal\u0131 R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"33","cbsa":"33","opened":2016},{"type":"wind","name":"GERES","x":295.9,"y":402.8,"cell":2960,"value":30,"detail":"30 MW, opened 2014/2015, Manisa, position from OpenStreetMap (Geres RES), T\u00dcREB list, January 2025","state":"45","cbsa":"45","opened":2014},{"type":"wind","name":"Karacabey RES","x":344.8,"y":284.0,"cell":2090,"value":30,"detail":"30 MW, opened 2016, Bursa, position from OpenStreetMap (Karacabey R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"16","cbsa":"16","opened":2016},{"type":"wind","name":"Maz\u0131-3 RES","x":161.4,"y":500.2,"cell":3606,"value":30,"detail":"30 MW, opened 2011, \u0130zmir, position from OpenStreetMap (Maz\u0131 3 R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2011},{"type":"wind","name":"S\u00f6ke RES","x":234.0,"y":565.4,"cell":4156,"value":30,"detail":"30 MW, opened 2010, Ayd\u0131n, position from OpenStreetMap (S\u00f6ke \u00c7atalb\u00fck R\u00fczgar Santrali), T\u00dcREB list, January 2025","state":"09","cbsa":"09","opened":2010},{"type":"wind","name":"Alize Keltepe RES","x":315.2,"y":320.4,"cell":2307,"value":30,"detail":"29.9 MW, opened 2009/2014/2016, Bal\u0131kesir, position from OpenStreetMap (Keltepe R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"10","cbsa":"10","opened":2009},{"type":"wind","name":"Mahmudiye RES","x":160.8,"y":316.7,"cell":2298,"value":30,"detail":"29.9 MW, opened 2010, \u00c7anakkale, approximate position: Mahmudiye (village, OpenStreetMap), the place it is named after, T\u00dcREB list, January 2025","state":"17","cbsa":"17","opened":2010,"approx":"place"},{"type":"wind","name":"Balabanl\u0131 Extension- II RES","x":291.2,"y":194.6,"cell":1433,"value":30,"detail":"29.5 MW, opened 2024, Tekirda\u011f, position from WRI GPPD (Balabani), T\u00dcREB list, January 2025","state":"59","cbsa":"59","opened":2024},{"type":"wind","name":"\u0130ncesu RES","x":520.5,"y":467.3,"cell":3409,"value":29,"detail":"29.2 MW, opened 2014/2017, Afyon, approximate position: Afyonkarahisar province centre, T\u00dcREB list, January 2025","state":"03","cbsa":"03","opened":2014,"approx":"province"},{"type":"wind","name":"Karam\u00fcrsel RES","x":453.4,"y":248.3,"cell":1879,"value":29,"detail":"29 MW, opened 2023, Kocaeli, approximate position: Karam\u00fcrsel (town, OpenStreetMap), the place it is named after, T\u00dcREB list, January 2025","state":"41","cbsa":"41","opened":2023,"approx":"place"},{"type":"wind","name":"Dilek RES","x":1035.9,"y":610.7,"cell":4528,"value":29,"detail":"28.8 MW, opened 2015/2018, Kahramanmara\u015f, position from OpenStreetMap (Dilek R\u00fczgar Enerjisi Santrali), T\u00dcREB list, January 2025","state":"46","cbsa":"46","opened":2015},{"type":"wind","name":"Eber Extension RES","x":502.7,"y":497.2,"cell":3626,"value":29,"detail":"28.8 MW, opened 2023, Afyon, position from OpenStreetMap (Eber R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"03","cbsa":"03","opened":2023},{"type":"wind","name":"Ovac\u0131k RES","x":226.4,"y":489.7,"cell":3610,"value":29,"detail":"28.8 MW, opened 2019, \u0130zmir, approximate position: \u0130zmir province centre, T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2019,"approx":"province"},{"type":"wind","name":"\u015eenb\u00fck RES","x":1014.4,"y":735.6,"cell":5399,"value":29,"detail":"28.8 MW, opened 2013, Hatay, position from OpenStreetMap (\u015eenb\u00fck R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"31","cbsa":"31","opened":2013},{"type":"wind","name":"Ayy\u0131ld\u0131z RES","x":305.2,"y":275.4,"cell":2088,"value":28,"detail":"28.2 MW, opened 2009/2017, Bal\u0131kesir, position from OpenStreetMap (Ayy\u0131ld\u0131z RES), T\u00dcREB list, January 2025","state":"10","cbsa":"10","opened":2009},{"type":"wind","name":"G\u00f6kzirve RES","x":320.2,"y":626.8,"cell":4596,"value":28,"detail":"28 MW, opened 2020/2021, Mu\u011fla, approximate position: Mu\u011fla province centre, T\u00dcREB list, January 2025","state":"48","cbsa":"48","opened":2020,"approx":"province"},{"type":"wind","name":"\u00d6rlemi\u015f RES","x":227.1,"y":429.2,"cell":3174,"value":28,"detail":"28 MW, opened 2020, \u0130zmir, position from OpenStreetMap (\u00d6rlemi\u015f RES), T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2020},{"type":"wind","name":"Alize \u00c7ataltepe RES","x":234.9,"y":362.9,"cell":2630,"value":28,"detail":"27.8 MW, opened 2010/2019, Bal\u0131kesir, position from OpenStreetMap (\u00c7ataltepe RES), T\u00dcREB list, January 2025","state":"10","cbsa":"10","opened":2010},{"type":"wind","name":"Salman RES","x":159.4,"y":454.4,"cell":3388,"value":28,"detail":"27.5 MW, opened 2014, \u0130zmir, position from OpenStreetMap (Salman R\u00fczg\u00e2r Enerjisi Santrali), T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2014},{"type":"wind","name":"SaRES","x":164.2,"y":335.7,"cell":2516,"value":28,"detail":"27.5 MW, opened 2010/2015, \u00c7anakkale, position from OpenStreetMap (Sares RES), T\u00dcREB list, January 2025","state":"17","cbsa":"17","opened":2010},{"type":"wind","name":"Sincik RES","x":1221.9,"y":549.4,"cell":4103,"value":28,"detail":"27.5 MW, opened 2013, Ad\u0131yaman, position from OpenStreetMap (Sincik R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"02","cbsa":"02","opened":2013},{"type":"wind","name":"Karatepe RES","x":279.5,"y":203.4,"cell":1433,"value":27,"detail":"27.2 MW, opened 2020/2021/2024, Tekirda\u011f, approximate position: Tekirda\u011f province centre, T\u00dcREB list, January 2025","state":"59","cbsa":"59","opened":2020,"approx":"province"},{"type":"wind","name":"\u00c7andarl\u0131 RES","x":210.6,"y":425.9,"cell":3064,"value":26,"detail":"26 MW, opened 2021, \u0130zmir, approximate position: \u00c7andarl\u0131 (village, OpenStreetMap), the place it is named after, T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2021,"approx":"place"},{"type":"wind","name":"Zeliha RES","x":283.2,"y":115.2,"cell":888,"value":26,"detail":"25.6 MW, opened 2016, K\u0131rklareli, position from OpenStreetMap (Zeliha RES), T\u00dcREB list, January 2025","state":"39","cbsa":"39","opened":2016},{"type":"wind","name":"Bergama RES","x":236.8,"y":421.7,"cell":3066,"value":25,"detail":"25.2 MW, opened 2018, \u0130zmir, position from OpenStreetMap (Berg R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2018},{"type":"wind","name":"\u00c7ayp\u0131nar RES","x":306.7,"y":337.4,"cell":2524,"value":25,"detail":"25.2 MW, opened 2020, Bal\u0131kesir, approximate position: \u00c7ayp\u0131nar (village, OpenStreetMap), the place it is named after, T\u00dcREB list, January 2025","state":"10","cbsa":"10","opened":2020,"approx":"place"},{"type":"wind","name":"Korkmaz RES","x":217.3,"y":484.6,"cell":3501,"value":25,"detail":"25.2 MW, opened 2014, \u0130zmir, approximate position: \u0130zmir province centre, T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2014,"approx":"province"},{"type":"wind","name":"TR, Akk\u00f6y YEKA II RES","x":225.5,"y":588.7,"cell":4264,"value":25,"detail":"25.2 MW, opened 2023, Ayd\u0131n, approximate position: Akk\u00f6y (village, OpenStreetMap), the place it is named after, T\u00dcREB list, January 2025","state":"09","cbsa":"09","opened":2023,"approx":"place"},{"type":"wind","name":"KORES","x":175.0,"y":494.9,"cell":3607,"value":25,"detail":"25 MW, opened 2009/2012/2015, \u0130zmir, position from OpenStreetMap (Kores Kocada\u011f R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2009},{"type":"wind","name":"Ba\u011flar-3 RES","x":705.9,"y":543.3,"cell":3965,"value":24,"detail":"24 MW, opened 2021, Konya, position from OpenStreetMap (Ba\u011flar R\u00fczgar Elektrik Santrali), T\u00dcREB list, January 2025","state":"42","cbsa":"42","opened":2021},{"type":"wind","name":"\u0130pektepe RES","x":1592.4,"y":341.0,"cell":2598,"value":24,"detail":"24 MW, opened 2021/2022, A\u011fr\u0131, approximate position: A\u011fr\u0131 province centre, T\u00dcREB list, January 2025","state":"04","cbsa":"04","opened":2021,"approx":"province"},{"type":"wind","name":"Menek\u015fe RES","x":890.6,"y":358.5,"cell":2667,"value":24,"detail":"24 MW, opened 2024, Yozgat, approximate position: Yozgat province centre, T\u00dcREB list, January 2025","state":"66","cbsa":"66","opened":2024,"approx":"province"},{"type":"wind","name":"Turguttepe RES","x":271.8,"y":596.7,"cell":4266,"value":24,"detail":"24 MW, opened 2010, Ayd\u0131n, position from OpenStreetMap (Turguttepe R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"09","cbsa":"09","opened":2010},{"type":"wind","name":"Akda\u011f RES","x":614.0,"y":600.2,"cell":4395,"value":24,"detail":"23.6 MW, opened 2018, Konya, position from OpenStreetMap (Akda\u011f R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"42","cbsa":"42","opened":2018},{"type":"wind","name":"Demirciler RES","x":1015.6,"y":665.2,"cell":4855,"value":23,"detail":"23.3 MW, opened 2016, Osmaniye, approximate position: Osmaniye province centre, T\u00dcREB list, January 2025","state":"80","cbsa":"80","opened":2016,"approx":"province"},{"type":"wind","name":"Pamukova RES","x":514.3,"y":267.8,"cell":1992,"value":23,"detail":"22.8 MW, opened 2020, Sakarya, position from OpenStreetMap (Pamukova R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"54","cbsa":"54","opened":2020},{"type":"wind","name":"Ada RES","x":234.7,"y":544.1,"cell":4265,"value":22,"detail":"22 MW, opened 2015/2021, Mu\u011fla/\u0130zmir, position from OpenStreetMap (Adares R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"48","cbsa":"48","opened":2015},{"type":"wind","name":"Akb\u00fck RES","x":233.9,"y":596.4,"cell":4373,"value":22,"detail":"21.6 MW, opened 2015/2018, Ayd\u0131n, position from OpenStreetMap (Akb\u00fck R\u00fczgar Santrali), T\u00dcREB list, January 2025","state":"09","cbsa":"09","opened":2015},{"type":"wind","name":"Enez RES","x":165.7,"y":222.8,"cell":1644,"value":22,"detail":"21.6 MW, opened 2009/2015, Edirne, position from OpenStreetMap (Boreas 1 Enez R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"22","cbsa":"22","opened":2009},{"type":"wind","name":"Karakurt RES","x":288.1,"y":414.2,"cell":3069,"value":22,"detail":"21.6 MW, opened 2007/2021, Manisa, position from OpenStreetMap (Karakurt R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"45","cbsa":"45","opened":2007},{"type":"wind","name":"Yah\u015felli RES","x":222.6,"y":463.5,"cell":3391,"value":22,"detail":"21.6 MW, opened 2019, \u0130zmir, approximate position: Yah\u015felli (village, OpenStreetMap), the place it is named after, T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2019,"approx":"place"},{"type":"wind","name":"Yenihisar RES","x":277.4,"y":555.3,"cell":4049,"value":22,"detail":"21.6 MW, opened 2018, Ayd\u0131n, approximate position: Ayd\u0131n province centre, T\u00dcREB list, January 2025","state":"09","cbsa":"09","opened":2018,"approx":"province"},{"type":"wind","name":"Seferihisar II RES","x":188.6,"y":506.2,"cell":3607,"value":21,"detail":"21 MW, opened 2017, \u0130zmir, position from OpenStreetMap (Seferihisar R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"35","cbsa":"35","opened":2017},{"type":"wind","name":"G\u00fcnayd\u0131n RES","x":312.3,"y":318.5,"cell":2307,"value":21,"detail":"20.8 MW, opened 2012/2014, Bal\u0131kesir, position from OpenStreetMap (G\u00fcnayd\u0131n R\u00fczgar Enerjisi Santrali), T\u00dcREB list, January 2025","state":"10","cbsa":"10","opened":2012},{"type":"wind","name":"Madranbaba RES","x":308.7,"y":578.3,"cell":4268,"value":20,"detail":"20 MW, opened 2013, Ayd\u0131n, position from OpenStreetMap (\u00c7ine Madranbaba R\u00fczgar Enerji Santrali), T\u00dcREB list, January 2025","state":"09","cbsa":"09","opened":2013},{"type":"solar","name":"Karaman Ayranc\u0131 G24 YEKA","x":801.5,"y":637.2,"cell":4624,"value":350,"detail":"350 MW, opened 2026, Temmuz G\u00fcne\u015f Enerji \u00dcretim Sanayi ve Ticaret A.\u015e., OpenStreetMap","state":"70","cbsa":"70","opened":2026},{"type":"solar","name":"Viran\u015fehir 5-7-8 GES","x":1342.5,"y":615.3,"cell":4546,"value":195,"detail":"195 MW, opening year unknown, Kalyon Enerji, OpenStreetMap","state":"63","cbsa":"63"},{"type":"solar","name":"Viran\u015fehir G\u00fcne\u015f Enerji Santrali","x":1310.0,"y":643.5,"cell":4762,"value":191,"detail":"191 MW, opening year unknown, Eksim Enerji, OpenStreetMap","state":"63","cbsa":"63"},{"type":"solar","name":"Bor-3 GES","x":858.9,"y":584.6,"cell":4300,"value":100,"detail":"100 MW, opening year unknown, Kalyon Enerji, OpenStreetMap","state":"51","cbsa":"51"},{"type":"solar","name":"U\u015fak R\u00fczgar Santrali Hibrit GES","x":469.1,"y":459.0,"cell":3297,"value":82,"detail":"82 MW, opened 2023, Aydem Yenilenebilir Enerji, OpenStreetMap","state":"43","cbsa":"43","opened":2023},{"type":"solar","name":"G\u00fcne\u015f Enerji Santrali","x":1399.0,"y":454.2,"cell":3351,"value":80,"detail":"80 MW, opening year unknown, Cengiz Enerji, OpenStreetMap","state":"12","cbsa":"12"},{"type":"solar","name":"Gaziantep-1-1/2-1/3-1 GES","x":1100.5,"y":675.2,"cell":4968,"value":65,"detail":"65 MW, opening year unknown, Kalyon Enerji, OpenStreetMap","state":"27","cbsa":"27"},{"type":"solar","name":"K\u0131van\u00e7 II - G\u00fcne\u015f Enerji Santrali","x":751.5,"y":722.7,"cell":5275,"value":52,"detail":"52 MW, opened 2020, OpenStreetMap","state":"33","cbsa":"33","opened":2020},{"type":"solar","name":"Eti Bak\u0131r 2 GES","x":1376.3,"y":602.8,"cell":4439,"value":52,"detail":"52 MW, opening year unknown, Eti Bak\u0131r, OpenStreetMap","state":"21","cbsa":"21"},{"type":"solar","name":"Ye\u015filyurt Demir \u00c7elik GES","x":1254.9,"y":605.7,"cell":4541,"value":50,"detail":"50 MW, opening year unknown, Ye\u015filyurt Demir \u00c7elik, OpenStreetMap","state":"63","cbsa":"63"},{"type":"solar","name":"Ba\u011flama G\u00fcne\u015f Enerji Santrali","x":1595.8,"y":496.8,"cell":3689,"value":50,"detail":"50 MW, opening year unknown, Ares Elektrik, OpenStreetMap","state":"65","cbsa":"65"},{"type":"solar","name":"Sasa Gaziantep Ar\u0131l GES","x":1135.1,"y":654.1,"cell":4752,"value":45,"detail":"45 MW, opening year unknown, SASA Polyester Sanayi A.\u015e., OpenStreetMap","state":"27","cbsa":"27"},{"type":"solar","name":"Ar\u0131su G\u00fcne\u015f Enerji Santrali","x":1618.8,"y":459.9,"cell":3364,"value":45,"detail":"45 MW, opening year unknown, Erciyes Anadolu Holding, OpenStreetMap","state":"65","cbsa":"65"},{"type":"solar","name":"Kangal R\u00fczgar Santrali Hibrit GES","x":1099.0,"y":441.4,"cell":3224,"value":40,"detail":"40 MW, opening year unknown, Ece Tur \u0130n\u015faat, OpenStreetMap","state":"58","cbsa":"58"},{"type":"solar","name":"\u00d6zkoyuncu Madencilik Bal\u0131kesir G\u00fcne\u015f Enerji Santrali","x":291.6,"y":348.5,"cell":2523,"value":40,"detail":"40 MW, opening year unknown, \u00d6zkoyuncu Madencilik, OpenStreetMap","state":"10","cbsa":"10"},{"type":"solar","name":"Seydi\u015fehir Al\u00fcminyum G\u00fcne\u015f Enerji Santrali","x":628.7,"y":619.1,"cell":4505,"value":38,"detail":"38 MW, opening year unknown, Seydi\u015fehir Al\u00fcminyum, OpenStreetMap","state":"42","cbsa":"42"},{"type":"solar","name":"G\u00fcne\u015f Enerji Santrali","x":1621.1,"y":486.7,"cell":3690,"value":37,"detail":"37 MW, opening year unknown, Akfen Holding, OpenStreetMap","state":"65","cbsa":"65"},{"type":"solar","name":"Hilvan G\u00fcne\u015f Enerji Santrali","x":1251.4,"y":608.7,"cell":4541,"value":37,"detail":"37 MW, opening year unknown, OpenStreetMap","state":"63","cbsa":"63"},{"type":"solar","name":"G\u00fcne\u015f Enerji Santrali","x":439.3,"y":646.6,"cell":4712,"value":35,"detail":"35 MW, opening year unknown, Ferg\u00fcn Enerji, OpenStreetMap","state":"15","cbsa":"15"},{"type":"solar","name":"Lidersan G\u00fcne\u015f Enerji Santrali","x":1125.7,"y":682.0,"cell":5079,"value":34,"detail":"34 MW, opening year unknown, Lidersan Sa\u011fl\u0131k ve G\u0131da \u00dcr\u00fcnleri A.\u015e., OpenStreetMap","state":"27","cbsa":"27"},{"type":"solar","name":"Teksin Enerji G\u00fcne\u015f Enerji Santrali","x":758.0,"y":650.7,"cell":4730,"value":33,"detail":"33 MW, opening year unknown, Teksin Enerji, OpenStreetMap","state":"70","cbsa":"70"},{"type":"solar","name":"Akseki B\u00fcy\u00fckalan 1 G\u00fcne\u015f Enerji Santrali","x":617.4,"y":665.2,"cell":4832,"value":33,"detail":"33 MW, opened 2021, OpenStreetMap","state":"07","cbsa":"07","opened":2021},{"type":"solar","name":"Ba\u015far\u0131 Enerji Siverek GES","x":1293.8,"y":587.4,"cell":4325,"value":32,"detail":"32 MW, opening year unknown, Ba\u015far\u0131 Enerji, OpenStreetMap","state":"63","cbsa":"63"},{"type":"solar","name":"K\u00fc\u00e7\u00fckk\u00f6y G\u00fcne\u015f Enerji Santrali","x":485.2,"y":652.6,"cell":4824,"value":31,"detail":"31 MW, opening year unknown, Art\u0131bir Enerji, OpenStreetMap","state":"07","cbsa":"07"},{"type":"solar","name":"C\u0131ng\u0131ll\u0131 G\u00fcne\u015f Enerji Santrali","x":850.5,"y":586.4,"cell":4300,"value":26,"detail":"26 MW, opening year unknown, C\u0131ng\u0131ll\u0131 Organik Tar\u0131m, OpenStreetMap","state":"51","cbsa":"51"},{"type":"solar","name":"G\u00fcne\u015f Enerji Santrali","x":1056.3,"y":663.0,"cell":4857,"value":25,"detail":"25 MW, opening year unknown, OpenStreetMap","state":"27","cbsa":"27"},{"type":"solar","name":"Alages Adilcevaz solar farm","x":1564.7,"y":431.7,"cell":3251,"value":24,"detail":"24 MW, opened 2020, G\u00fclbahar Elektrik \u00dcretim AS, OpenStreetMap","state":"13","cbsa":"13","opened":2020},{"type":"solar","name":"Ey\u00fcpnebi G\u00fcne\u015f Enerji Santrali","x":1319.5,"y":617.9,"cell":4545,"value":22,"detail":"22 MW, opening year unknown, Aldo Enerji, OpenStreetMap","state":"63","cbsa":"63"},{"type":"solar","name":"Hitit Enerji G\u00fcne\u015f Enerji","x":1300.6,"y":639.6,"cell":4762,"value":20,"detail":"20 MW, opening year unknown, OpenStreetMap","state":"63","cbsa":"63"},{"type":"silver","name":"Aktepe","x":458.1,"y":362.7,"cell":2642,"value":null,"detail":"silver, Yil Gumus Madeni Isletmesi Muessesesi Mudurlugu (Etibank, 100%), capacity 105000 kg t / yr, USGS 2003","state":"43","cbsa":"43"},{"type":"boron","name":"Bigadic","x":317.6,"y":384.0,"cell":2852,"value":null,"detail":"boron, Etibank Bigadic Madencilic Isletmeleri, capacity 400 colemani t / yr, USGS 2003","state":"10","cbsa":"10"},{"type":"boron","name":"Emet. Espey and Hisarc?k","x":414.0,"y":396.2,"cell":2858,"value":null,"detail":"boron, Etibank Emet Kolemanit Isletmeri (Etibank, 100%), capacity 500 colemani t / yr, USGS 2003","state":"43","cbsa":"43"},{"type":"boron","name":"Kestelek","x":359.4,"y":322.9,"cell":2419,"value":null,"detail":"boron, Etibank Kestelek Kolemanit Isletmeleri (Etibank, 100%), capacity 100 colemani t / yr, USGS 2003","state":"16","cbsa":"16"},{"type":"boron","name":"Kirka","x":493.9,"y":468.7,"cell":3407,"value":null,"detail":"boron, Etibank Kirka Boraks Isletmeri Muessesesi Mudurlugu (Etibank, 100%), capacity 600 tincal t / yr, USGS 2003","state":"03","cbsa":"03"},{"type":"chromium","name":"Adana","x":936.2,"y":670.4,"cell":4959,"value":null,"detail":"chromite ores - concentrates, Akdeniz Madencilik Ticaret ve Sanayi A.S., capacity 25 lump ore t / yr, USGS 2003","state":"01","cbsa":"01"},{"type":"chromium","name":"Bursa","x":403.1,"y":300.8,"cell":2203,"value":null,"detail":"chromite ores - concentrates, Other private producers (9), capacity 28 lump ore t / yr, USGS 2003","state":"16","cbsa":"16"},{"type":"chromium","name":"Erzincan Province","x":1290.7,"y":356.7,"cell":2691,"value":null,"detail":"chromite ores - concentrates, Akpas Madencilik ve Paz. ve Ticaret A.S., capacity 66 lump ore t / yr, USGS 2003","state":"24","cbsa":"24"},{"type":"chromium","name":"Erzurum Province","x":1441.7,"y":330.3,"cell":2481,"value":null,"detail":"chromite ores - concentrates, Akpas Madencilik ve Paz. ve Ticaret A.S., capacity 66 lump ore t / yr, USGS 2003","state":"25","cbsa":"25"},{"type":"chromium","name":"Eskisehir province","x":524.5,"y":354.0,"cell":2646,"value":null,"detail":"chromite ores - concentrates, Egemetal Madencilik A.S., capacity 62 lump ore t / yr, USGS 2003","state":"26","cbsa":"26"},{"type":"chromium","name":"Gocek District, Fethiye area","x":366.4,"y":681.2,"cell":4926,"value":null,"detail":"chromite ores - concentrates, Etibank Uckopru Maden Isletmesi (Muessesesi Mudurlugu, capacity 15 lump ore t / yr, USGS 2003","state":"48","cbsa":"48"},{"type":"chromium","name":"Guleman","x":1333.4,"y":503.2,"cell":3783,"value":null,"detail":"chromite ores - concentrates, Etibank Sark Kromlari Isletmesi Muessesesi Mudurlugu, capacity 150 lump ore t / yr, USGS 2003","state":"21","cbsa":"21"},{"type":"chromium","name":"Iskenderun","x":1011.0,"y":718.1,"cell":5291,"value":null,"detail":"chromite ores - concentrates, Other private producers (9), capacity 28 lump ore t / yr, USGS 2003","state":"31","cbsa":"31"},{"type":"chromium","name":"Kayseri","x":949.0,"y":479.5,"cell":3543,"value":null,"detail":"chromite ores - concentrates, Akpas Madencilik ve Paz. ve Ticaret A.S., capacity 66 lump ore t / yr, USGS 2003","state":"38","cbsa":"38"},{"type":"chromium","name":"Koycegiz","x":702.8,"y":226.5,"cell":1675,"value":null,"detail":"chromite ores - concentrates, Turk Maadin Sirketi A.S., capacity 12 lump ore t / yr, USGS 2003","state":"78","cbsa":"78"},{"type":"chromium","name":"Mersin province","x":875.2,"y":701.9,"cell":5065,"value":null,"detail":"chromite ores - concentrates, Egemetal Madencilik A.S., capacity 62 lump ore t / yr, USGS 2003","state":"33","cbsa":"33"},{"type":"coal_mine","name":"Zonguldak, Coalfields","x":639.4,"y":171.9,"cell":1345,"value":null,"detail":"coal, Turkiye Taskomuru Kurumu Genel Mudurlugu (Etibank 100%), capacity 7,000 t / yr, USGS 2003","state":"67","cbsa":"67"},{"type":"copper","name":"Cayeli Mine","x":1303.2,"y":211.5,"cell":1710,"value":null,"detail":"copper, Cayeli Bakir Isletmeleri A.S., capacity 29 copper co t / yr, USGS 2003","state":"61","cbsa":"61"},{"type":"copper","name":"Gebze","x":479.2,"y":241.3,"cell":1772,"value":null,"detail":"copper, Sarkuysan Elektrolitik Bakir Sanayii ve Ticaret A.S., capacity 70 t / yr, USGS 2003","state":"41","cbsa":"41"},{"type":"copper","name":"Istanbul","x":401.0,"y":208.5,"cell":1550,"value":null,"detail":"copper, Rabak Elektrolitik Bak?r ve Mam. A.S., capacity 35 t / yr, USGS 2003","state":"34","cbsa":"34"},{"type":"copper","name":"Kayseri","x":949.0,"y":479.5,"cell":3543,"value":null,"detail":"copper, Hes Kablo, capacity 31 t / yr, USGS 2003","state":"38","cbsa":"38"},{"type":"copper","name":"Kure","x":800.5,"y":137.7,"cell":1027,"value":null,"detail":"copper, Etibank Kure Bakirli Pirit Isletmetsi Muessesesi Mudurlugu, capacity 55 copper co t / yr, USGS 2003","state":"37","cbsa":"37"},{"type":"copper","name":"Murgul near Artvin","x":1455.3,"y":177.1,"cell":1392,"value":null,"detail":"copper, Karadeniz Bak?r Isletmeleri A.S. (Etibank, 99.97%), capacity 132 copper c t / yr, USGS 2003","state":"08","cbsa":"08"},{"type":"iron","name":"Divrigi","x":1173.5,"y":404.5,"cell":3010,"value":null,"detail":"iron - ore, Turkiye Demir ve Celik Isletmeleri Genel Mudurlugu (TDCI), capacity 3000 ore, 10 t / yr, USGS 2003","state":"58","cbsa":"58"},{"type":"iron","name":"Hekimhan, Deveci","x":1160.9,"y":466.4,"cell":3446,"value":null,"detail":"iron - ore, Turkiye Demir ve Celik Isletmeleri Genel Mudurlugu (TDCI), capacity 750 ore t / yr, USGS 2003","state":"44","cbsa":"44"},{"type":"lead_zinc","name":"Cayeli Mine","x":1303.2,"y":211.5,"cell":1710,"value":null,"detail":"zinc, Cayeli Bak?r Isletmeleri A.S., capacity 36 t / yr, USGS 2003","state":"61","cbsa":"61"},{"type":"chromium","name":"Kavak Mine","x":1107.9,"y":382.3,"cell":2898,"value":null,"detail":"chromium, USGS MRDS producer","state":"58","cbsa":"58"},{"type":"chromium","name":"Uc Kopru Mine","x":329.1,"y":649.0,"cell":4706,"value":null,"detail":"chromium, USGS MRDS producer","state":"48","cbsa":"48"},{"type":"copper","name":"Asikoy Mine","x":795.5,"y":172.3,"cell":1354,"value":null,"detail":"copper, sulphur (pyrite), USGS MRDS producer","state":"37","cbsa":"37"},{"type":"copper","name":"Cakmakkaya Mine","x":1477.1,"y":193.7,"cell":1502,"value":null,"detail":"copper, sulphur (pyrite), USGS MRDS producer","state":"08","cbsa":"08"},{"type":"copper","name":"Kure Mine","x":922.6,"y":443.2,"cell":3323,"value":null,"detail":"copper, sulphur (pyrite), USGS MRDS producer","state":"38","cbsa":"38"},{"type":"iron","name":"Attepe Mine","x":1178.3,"y":499.9,"cell":3665,"value":null,"detail":"iron, USGS MRDS producer","state":"44","cbsa":"44"},{"type":"iron","name":"Bizmisen Mine","x":1276.5,"y":365.9,"cell":2690,"value":null,"detail":"iron, USGS MRDS producer","state":"24","cbsa":"24"},{"type":"iron","name":"Cetinkaya Mine","x":1107.9,"y":382.3,"cell":2898,"value":null,"detail":"iron, USGS MRDS producer","state":"58","cbsa":"58"},{"type":"lead_zinc","name":"Cinkur Mine","x":708.1,"y":573.0,"cell":4183,"value":null,"detail":"zinc, lead, cadmium, silver, USGS MRDS producer","state":"42","cbsa":"42"},{"type":"boron","name":"Hisarcik","x":413.9,"y":408.5,"cell":2966,"value":null,"detail":"boron, arsenic, strontium, iron, USGS MRDS producer","state":"43","cbsa":"43"},{"type":"boron","name":"Kestelek","x":372.8,"y":357.5,"cell":2638,"value":null,"detail":"boron, USGS MRDS producer","state":"16","cbsa":"16"},{"type":"iron","name":"Deveci Mine","x":1165.0,"y":455.0,"cell":3337,"value":null,"detail":"iron, USGS MRDS producer","state":"44","cbsa":"44"},{"type":"iron","name":"Divrigi Iron Ore Deposit","x":1172.3,"y":399.1,"cell":3010,"value":null,"detail":"iron, USGS MRDS producer","state":"58","cbsa":"58"},{"type":"lead_zinc","name":"Aladag","x":950.7,"y":533.3,"cell":3979,"value":null,"detail":"zinc, lead, USGS MRDS producer","state":"38","cbsa":"38"},{"type":"chromium","name":"Kef Dagi","x":1317.5,"y":496.8,"cell":3673,"value":null,"detail":"chromium, USGS MRDS producer","state":"23","cbsa":"23"},{"type":"copper","name":"Ergani","x":1320.0,"y":494.8,"cell":3673,"value":null,"detail":"cobalt, copper, gold, iron, silver, sulphur, USGS MRDS producer","state":"23","cbsa":"23"},{"type":"copper","name":"Guzelyayla","x":1296.7,"y":236.1,"cell":1819,"value":null,"detail":"copper, molybdenum, USGS MRDS producer","state":"61","cbsa":"61"},{"type":"chromium","name":"Turk Maadin Sirketiacipayam Ops.","x":410.4,"y":605.2,"cell":4384,"value":null,"detail":"chromium, USGS MRDS producer","state":"20","cbsa":"20"},{"type":"copper","name":"Murgul Bakir Istetmesi Muessesesi","x":1462.0,"y":151.6,"cell":1283,"value":null,"detail":"copper, sulphuric acid, USGS MRDS producer","state":"08","cbsa":"08"},{"type":"chromium","name":"Kangal","x":1113.6,"y":419.4,"cell":3116,"value":null,"detail":"chromium, USGS MRDS producer","state":"58","cbsa":"58"},{"type":"copper","name":"Ergani - Maden","x":1315.1,"y":483.9,"cell":3564,"value":null,"detail":"copper, gold, silver, sulphur (pyrite), USGS MRDS producer","state":"23","cbsa":"23"},{"type":"chromium","name":"Kestelek","x":359.5,"y":323.1,"cell":2419,"value":null,"detail":"chromium, USGS MRDS producer","state":"16","cbsa":"16"},{"type":"chromium","name":"Bilfer Malatya Operations","x":1132.3,"y":472.7,"cell":3444,"value":null,"detail":"chromium, USGS MRDS producer","state":"44","cbsa":"44"},{"type":"lead_zinc","name":"Akdagmadeni Deposits","x":991.2,"y":373.5,"cell":2782,"value":null,"detail":"lead, silver, zinc, USGS MRDS producer","state":"66","cbsa":"66"},{"type":"chromium","name":"M.K.Dedeman Karsanti Opers.","x":939.4,"y":611.2,"cell":4523,"value":null,"detail":"chromium, USGS MRDS producer","state":"01","cbsa":"01"},{"type":"chromium","name":"M.K.Dedeman Burdur Operations","x":444.5,"y":599.8,"cell":4386,"value":null,"detail":"chromium, USGS MRDS producer","state":"15","cbsa":"15"},{"type":"chromium","name":"Uckopru Maden Isletmeleri","x":383.7,"y":698.2,"cell":5036,"value":null,"detail":"chromium, USGS MRDS producer","state":"48","cbsa":"48"},{"type":"copper","name":"Kutlular Surmene","x":1335.9,"y":225.5,"cell":1712,"value":null,"detail":"copper, USGS MRDS producer","state":"61","cbsa":"61"},{"type":"chromium","name":"Harmancik Operation","x":408.6,"y":356.1,"cell":2640,"value":null,"detail":"chromium, USGS MRDS producer","state":"43","cbsa":"43"},{"type":"chromium","name":"Uckopru","x":347.1,"y":625.2,"cell":4598,"value":null,"detail":"chromium, USGS MRDS producer","state":"48","cbsa":"48"},{"type":"boron","name":"Kirka","x":524.5,"y":409.1,"cell":2973,"value":null,"detail":"boron, USGS MRDS producer","state":"26","cbsa":"26"},{"type":"chromium","name":"Bascayir","x":1102.1,"y":477.2,"cell":3552,"value":null,"detail":"chromium, USGS MRDS producer","state":"58","cbsa":"58"},{"type":"chromium","name":"Islahiye Burcakli","x":1049.1,"y":665.6,"cell":4857,"value":null,"detail":"chromium, USGS MRDS producer","state":"27","cbsa":"27"},{"type":"chromium","name":"Hayri Ogelman Bursa Operations","x":389.4,"y":388.3,"cell":2856,"value":null,"detail":"chromium, USGS MRDS producer","state":"10","cbsa":"10"},{"type":"copper","name":"Lahamos Espiry","x":1220.5,"y":226.6,"cell":1705,"value":null,"detail":"copper, zinc, USGS MRDS producer","state":"28","cbsa":"28"},{"type":"chromium","name":"Kopdag West North Zone","x":1353.9,"y":327.7,"cell":2476,"value":null,"detail":"chromium, USGS MRDS producer","state":"24","cbsa":"24"},{"type":"chromium","name":"Iskenderun","x":1012.8,"y":723.6,"cell":5291,"value":null,"detail":"chromium, USGS MRDS producer","state":"31","cbsa":"31"},{"type":"chromium","name":"Adana Gerdibi","x":929.1,"y":611.2,"cell":4522,"value":null,"detail":"chromium, USGS MRDS producer","state":"01","cbsa":"01"},{"type":"chromium","name":"Koycegiz Operation","x":344.7,"y":658.4,"cell":4816,"value":null,"detail":"chromium, USGS MRDS producer","state":"48","cbsa":"48"},{"type":"lead_zinc","name":"Kayseri Processing Plant","x":947.6,"y":483.2,"cell":3543,"value":null,"detail":"lead, silver, USGS MRDS producer","state":"38","cbsa":"38"},{"type":"lead_zinc","name":"Kayseri","x":908.5,"y":490.8,"cell":3649,"value":null,"detail":"zinc, USGS MRDS producer","state":"50","cbsa":"50"},{"type":"lead_zinc","name":"Keban","x":1231.8,"y":465.5,"cell":3450,"value":null,"detail":"lead, zinc, USGS MRDS producer","state":"23","cbsa":"23"},{"type":"chromium","name":"Kavak","x":614.6,"y":338.8,"cell":2542,"value":null,"detail":"chromium, USGS MRDS producer","state":"26","cbsa":"26"},{"type":"iron","name":"Hekimhan Area","x":1157.6,"y":449.7,"cell":3337,"value":null,"detail":"iron, manganese, USGS MRDS producer","state":"44","cbsa":"44"},{"type":"chromium","name":"Kandak Sitke Kocman","x":334.3,"y":644.4,"cell":4706,"value":null,"detail":"chromium, USGS MRDS producer","state":"48","cbsa":"48"},{"type":"silver","name":"Aktepe Gumuskoy","x":430.7,"y":439.3,"cell":3185,"value":null,"detail":"silver, USGS MRDS producer","state":"43","cbsa":"43"},{"type":"chromium","name":"Coban Dogu Burcakli Operations","x":1018.0,"y":664.3,"cell":4855,"value":null,"detail":"chromium, USGS MRDS producer","state":"80","cbsa":"80"},{"type":"iron","name":"Mazidag","x":1391.8,"y":600.3,"cell":4440,"value":null,"detail":"phosphate, aluminium (bauxite), calcium (lime), iron, silica, uranium, USGS MRDS producer","state":"47","cbsa":"47"},{"type":"chromium","name":"Sariovia/Uzunoluk Area","x":384.5,"y":594.3,"cell":4382,"value":null,"detail":"chromium, USGS MRDS producer","state":"20","cbsa":"20"},{"type":"boron","name":"Egemetal Eskisehir Operations","x":522.8,"y":355.2,"cell":2646,"value":null,"detail":"boron, USGS MRDS producer","state":"26","cbsa":"26"},{"type":"chromium","name":"Egemetal","x":394.2,"y":336.6,"cell":2421,"value":null,"detail":"chromium, USGS MRDS producer","state":"16","cbsa":"16"},{"type":"iron","name":"Buyuk Eymir","x":243.3,"y":366.1,"cell":2630,"value":null,"detail":"iron, USGS MRDS producer","state":"10","cbsa":"10"},{"type":"chromium","name":"Pinarbasi Operation","x":1027.0,"y":480.6,"cell":3547,"value":null,"detail":"chromium, USGS MRDS producer","state":"38","cbsa":"38"},{"type":"boron","name":"Emet Area","x":403.8,"y":409.7,"cell":2966,"value":null,"detail":"boron, USGS MRDS producer","state":"43","cbsa":"43"},{"type":"chromium","name":"Harmancik","x":413.7,"y":343.4,"cell":2530,"value":null,"detail":"chromium, USGS MRDS producer","state":"16","cbsa":"16"},{"type":"iron","name":"Pinargozu - Davutoglu Deposit","x":1138.1,"y":424.3,"cell":3118,"value":null,"detail":"iron, USGS MRDS producer","state":"58","cbsa":"58"},{"type":"boron","name":"Gocenoluk","x":516.1,"y":405.0,"cell":2972,"value":null,"detail":"boron, USGS MRDS producer","state":"26","cbsa":"26"},{"type":"chromium","name":"Soridag","x":1324.3,"y":493.7,"cell":3673,"value":null,"detail":"chromium, USGS MRDS producer","state":"23","cbsa":"23"},{"type":"chromium","name":"Tokat Operation","x":1041.2,"y":300.5,"cell":2240,"value":null,"detail":"chromium, USGS MRDS producer","state":"60","cbsa":"60"},{"type":"boron","name":"Bigadic District","x":322.8,"y":376.2,"cell":2743,"value":null,"detail":"boron, gypsum, bentonite clay, USGS MRDS producer","state":"10","cbsa":"10"},{"type":"chromium","name":"Kefdag Mining Area","x":1313.5,"y":508.2,"cell":3782,"value":null,"detail":"chromium, USGS MRDS producer","state":"23","cbsa":"23"},{"type":"chromium","name":"Kopdag Mining Area","x":1372.1,"y":322.9,"cell":2477,"value":null,"detail":"chromium, USGS MRDS producer","state":"25","cbsa":"25"}],"summary":{"note":"Totals of the mapped sites only (each type's threshold applies), not T\u00fcrkiye's whole capacity or output. Mines have no size figure, so only their count is given.","national":{"hydro":{"count":21,"value":15175,"unit":"MW"},"coal_plant":{"count":22,"value":18561,"unit":"MW"},"gas_plant":{"count":21,"value":19236,"unit":"MW"},"geothermal":{"count":5,"value":354,"unit":"MW"},"wind":{"count":214,"value":12778,"unit":"MW"},"solar":{"count":35,"value":3320,"unit":"MW"},"coal_mine":{"count":1,"value":null,"unit":"site"},"chromium":{"count":41,"value":null,"unit":"site"},"boron":{"count":11,"value":null,"unit":"site"},"iron":{"count":11,"value":null,"unit":"site"},"copper":{"count":15,"value":null,"unit":"site"},"lead_zinc":{"count":7,"value":null,"unit":"site"},"silver":{"count":2,"value":null,"unit":"site"}},"states":{"01":{"coal_plant":{"count":2,"value":1660,"unit":"MW"},"gas_plant":{"count":1,"value":904,"unit":"MW"},"hydro":{"count":1,"value":310,"unit":"MW"},"wind":{"count":1,"value":33,"unit":"MW"},"chromium":{"count":3,"value":null,"unit":"site"}},"02":{"wind":{"count":1,"value":28,"unit":"MW"}},"03":{"wind":{"count":5,"value":397,"unit":"MW"},"boron":{"count":1,"value":null,"unit":"site"}},"04":{"wind":{"count":2,"value":58,"unit":"MW"}},"05":{"wind":{"count":2,"value":130,"unit":"MW"}},"06":{"gas_plant":{"count":2,"value":1177,"unit":"MW"},"coal_plant":{"count":1,"value":620,"unit":"MW"}},"07":{"gas_plant":{"count":1,"value":1150,"unit":"MW"},"hydro":{"count":1,"value":540,"unit":"MW"},"solar":{"count":2,"value":64,"unit":"MW"}},"08":{"hydro":{"count":4,"value":1850,"unit":"MW"},"copper":{"count":3,"value":null,"unit":"site"}},"09":{"geothermal":{"count":3,"value":229,"unit":"MW"},"wind":{"count":10,"value":416,"unit":"MW"}},"10":{"gas_plant":{"count":2,"value":1538,"unit":"MW"},"wind":{"count":23,"value":1432,"unit":"MW"},"solar":{"count":1,"value":40,"unit":"MW"},"boron":{"count":2,"value":null,"unit":"site"},"chromium":{"count":1,"value":null,"unit":"site"},"iron":{"count":1,"value":null,"unit":"site"}},"11":{"wind":{"count":4,"value":223,"unit":"MW"}},"12":{"hydro":{"count":1,"value":500,"unit":"MW"},"wind":{"count":1,"value":50,"unit":"MW"},"solar":{"count":1,"value":80,"unit":"MW"}},"13":{"solar":{"count":1,"value":24,"unit":"MW"}},"15":{"solar":{"count":1,"value":35,"unit":"MW"},"chromium":{"count":1,"value":null,"unit":"site"}},"16":{"gas_plant":{"count":2,"value":1918,"unit":"MW"},"wind":{"count":8,"value":567,"unit":"MW"},"boron":{"count":2,"value":null,"unit":"site"},"chromium":{"count":4,"value":null,"unit":"site"}},"17":{"coal_plant":{"count":5,"value":4445,"unit":"MW"},"wind":{"count":18,"value":1172,"unit":"MW"}},"18":{"wind":{"count":1,"value":51,"unit":"MW"}},"20":{"gas_plant":{"count":1,"value":775,"unit":"MW"},"geothermal":{"count":1,"value":80,"unit":"MW"},"wind":{"count":1,"value":75,"unit":"MW"},"chromium":{"count":2,"value":null,"unit":"site"}},"21":{"hydro":{"count":1,"value":1800,"unit":"MW"},"solar":{"count":1,"value":52,"unit":"MW"},"chromium":{"count":1,"value":null,"unit":"site"}},"22":{"wind":{"count":2,"value":86,"unit":"MW"}},"23":{"hydro":{"count":2,"value":1912,"unit":"MW"},"solar":{"count":1,"value":30,"unit":"MW"},"wind":{"count":1,"value":42,"unit":"MW"},"chromium":{"count":3,"value":null,"unit":"site"},"copper":{"count":2,"value":null,"unit":"site"},"lead_zinc":{"count":1,"value":null,"unit":"site"}},"24":{"chromium":{"count":2,"value":null,"unit":"site"},"iron":{"count":1,"value":null,"unit":"site"}},"25":{"chromium":{"count":2,"value":null,"unit":"site"}},"26":{"wind":{"count":1,"value":53,"unit":"MW"},"chromium":{"count":2,"value":null,"unit":"site"},"boron":{"count":3,"value":null,"unit":"site"}},"27":{"hydro":{"count":1,"value":672,"unit":"MW"},"solar":{"count":5,"value":194,"unit":"MW"},"wind":{"count":1,"value":66,"unit":"MW"},"chromium":{"count":1,"value":null,"unit":"site"}},"28":{"copper":{"count":1,"value":null,"unit":"site"}},"31":{"coal_plant":{"count":1,"value":1200,"unit":"MW"},"wind":{"count":9,"value":414,"unit":"MW"},"chromium":{"count":2,"value":null,"unit":"site"}},"32":{"wind":{"count":2,"value":127,"unit":"MW"}},"33":{"solar":{"count":2,"value":87,"unit":"MW"},"wind":{"count":5,"value":219,"unit":"MW"},"chromium":{"count":1,"value":null,"unit":"site"}},"34":{"gas_plant":{"count":2,"value":2167,"unit":"MW"},"wind":{"count":12,"value":913,"unit":"MW"},"copper":{"count":1,"value":null,"unit":"site"}},"35":{"gas_plant":{"count":1,"value":1520,"unit":"MW"},"coal_plant":{"count":1,"value":350,"unit":"MW"},"wind":{"count":34,"value":1719,"unit":"MW"}},"37":{"copper":{"count":2,"value":null,"unit":"site"}},"38":{"solar":{"count":1,"value":45,"unit":"MW"},"wind":{"count":5,"value":392,"unit":"MW"},"chromium":{"count":2,"value":null,"unit":"site"},"copper":{"count":2,"value":null,"unit":"site"},"lead_zinc":{"count":2,"value":null,"unit":"site"}},"39":{"gas_plant":{"count":1,"value":1156,"unit":"MW"},"wind":{"count":5,"value":427,"unit":"MW"}},"40":{"wind":{"count":2,"value":218,"unit":"MW"}},"41":{"gas_plant":{"count":1,"value":865,"unit":"MW"},"wind":{"count":2,"value":82,"unit":"MW"},"copper":{"count":1,"value":null,"unit":"site"}},"42":{"solar":{"count":2,"value":1338,"unit":"MW"},"wind":{"count":7,"value":400,"unit":"MW"},"lead_zinc":{"count":1,"value":null,"unit":"site"}},"43":{"coal_plant":{"count":2,"value":965,"unit":"MW"},"wind":{"count":1,"value":51,"unit":"MW"},"solar":{"count":1,"value":82,"unit":"MW"},"silver":{"count":2,"value":null,"unit":"site"},"boron":{"count":3,"value":null,"unit":"site"},"chromium":{"count":1,"value":null,"unit":"site"}},"44":{"iron":{"count":4,"value":null,"unit":"site"},"chromium":{"count":1,"value":null,"unit":"site"}},"45":{"coal_plant":{"count":2,"value":1500,"unit":"MW"},"geothermal":{"count":1,"value":45,"unit":"MW"},"solar":{"count":1,"value":21,"unit":"MW"},"wind":{"count":9,"value":732,"unit":"MW"}},"46":{"coal_plant":{"count":1,"value":2795,"unit":"MW"},"wind":{"count":2,"value":122,"unit":"MW"}},"47":{"iron":{"count":1,"value":null,"unit":"site"}},"48":{"coal_plant":{"count":3,"value":1680,"unit":"MW"},"wind":{"count":5,"value":202,"unit":"MW"},"chromium":{"count":6,"value":null,"unit":"site"}},"49":{"hydro":{"count":1,"value":637,"unit":"MW"}},"50":{"lead_zinc":{"count":1,"value":null,"unit":"site"}},"51":{"solar":{"count":2,"value":126,"unit":"MW"}},"52":{"wind":{"count":1,"value":42,"unit":"MW"}},"54":{"gas_plant":{"count":2,"value":2365,"unit":"MW"},"wind":{"count":4,"value":344,"unit":"MW"}},"55":{"gas_plant":{"count":2,"value":1736,"unit":"MW"},"hydro":{"count":3,"value":1713,"unit":"MW"},"wind":{"count":1,"value":56,"unit":"MW"}},"56":{"hydro":{"count":2,"value":829,"unit":"MW"}},"57":{"wind":{"count":1,"value":38,"unit":"MW"}},"58":{"coal_plant":{"count":1,"value":537,"unit":"MW"},"wind":{"count":1,"value":128,"unit":"MW"},"solar":{"count":1,"value":40,"unit":"MW"},"iron":{"count":4,"value":null,"unit":"site"},"chromium":{"count":3,"value":null,"unit":"site"}},"59":{"gas_plant":{"count":1,"value":478,"unit":"MW"},"wind":{"count":5,"value":193,"unit":"MW"}},"60":{"wind":{"count":2,"value":126,"unit":"MW"},"chromium":{"count":1,"value":null,"unit":"site"}},"61":{"copper":{"count":3,"value":null,"unit":"site"},"lead_zinc":{"count":1,"value":null,"unit":"site"}},"63":{"hydro":{"count":1,"value":2400,"unit":"MW"},"solar":{"count":7,"value":547,"unit":"MW"}},"64":{"wind":{"count":2,"value":156,"unit":"MW"}},"65":{"wind":{"count":1,"value":53,"unit":"MW"},"solar":{"count":3,"value":132,"unit":"MW"}},"66":{"wind":{"count":2,"value":54,"unit":"MW"},"lead_zinc":{"count":1,"value":null,"unit":"site"}},"67":{"coal_plant":{"count":2,"value":2404,"unit":"MW"},"coal_mine":{"count":1,"value":null,"unit":"site"}},"69":{"wind":{"count":1,"value":32,"unit":"MW"}},"70":{"hydro":{"count":1,"value":302,"unit":"MW"},"wind":{"count":1,"value":47,"unit":"MW"},"solar":{"count":2,"value":383,"unit":"MW"}},"71":{"gas_plant":{"count":2,"value":1487,"unit":"MW"},"wind":{"count":1,"value":43,"unit":"MW"}},"73":{"hydro":{"count":1,"value":1200,"unit":"MW"},"coal_plant":{"count":1,"value":405,"unit":"MW"}},"77":{"wind":{"count":5,"value":304,"unit":"MW"}},"78":{"chromium":{"count":1,"value":null,"unit":"site"}},"80":{"hydro":{"count":1,"value":510,"unit":"MW"},"wind":{"count":4,"value":265,"unit":"MW"},"chromium":{"count":1,"value":null,"unit":"site"}}},"national_capacity":{"source":"tr_t_energy_capacity","unit":"MW","years":[1940,1941,1942,1943,1944,1945,1946,1947,1948,1949,1950,1951,1952,1953,1954,1955,1956,1957,1958,1959,1960,1961,1962,1963,1964,1965,1966,1967,1968,1969,1970,1971,1972,1973,1974,1975,1976,1977,1978,1979,1980,1981,1982,1983,1984,1985,1986,1987,1988,1989,1990,1991,1992,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,2011,2012,2013,2014,2015,2016,2017,2018,2019,2020,2021,2022,2023,2024,2025],"series":{"coal":[148.2,148.2,148.2,155.7,157.9,157.9,157.9,157.9,200.0,267.4,272.1,279.4,291.1,323.1,324.9,379.9,500.4,544.8,556.0,556.0,556.0,556.0,559.0,560.1,560.1,611.2,620.8,624.0,626.0,626.0,641.2,641.2,643.2,943.2,943.4,943.4,943.4,1237.0,1370.3,1370.3,1370.3,1535.3,1922.7,2049.6,2579.2,3084.2,3777.0,4615.9,4615.9,5045.3,5205.7,5393.5,5757.7,5961.4,6171.4,6374.3,6389.3,6382.9,6548.9,6686.9,6988.9,6990.7,6982.9,8238.9,8295.8,9116.8,10196.8,10197.4,10191.0,10590.3,11950.3,12550.3,12575.8,12605.7,14813.9,15521.6,17355.3,18705.5,19032.4,19570.4,19613.0,19641.5,21099.1,21099.1,21221.3,21216.3],"gas":[null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,0,100.0,400.0,800.0,1555.2,2035.8,2210.0,2555.4,2591.7,2700.5,2823.9,2883.9,3051.2,3490.4,4047.1,4958.8,4904.5,4850.7,7247.1,8861.8,10131.2,10976.2,11462.2,11647.4,10656.8,11825.6,13302.1,13143.9,14116.4,17170.6,18724.4,18527.6,19563.6,22002.2,21479.9,21843.6,21599.4,21502.5,21243.9,21285.6,20577.8,20026.8],"hydro":[7.8,8.2,8.2,8.2,8.2,8.2,9.0,9.1,9.3,10.0,17.9,24.0,25.8,29.4,36.7,38.1,154.2,161.8,220.9,317.6,411.9,445.3,469.6,478.5,497.2,505.1,616.3,701.7,723.2,723.8,725.4,871.6,892.6,985.4,1449.2,1779.6,1872.6,1872.6,1880.8,2130.8,2130.8,2356.3,3082.3,3239.3,3874.8,3874.8,3877.5,5003.3,6218.3,6597.3,6764.3,7113.8,8378.7,9681.7,9864.6,9862.8,9934.8,10102.6,10306.5,10537.2,11175.2,11672.9,12240.9,12578.7,12645.4,12906.1,13062.7,13394.9,13828.7,14553.3,15831.2,17137.1,19609.4,22289.0,23643.2,25867.8,26681.1,27273.1,28291.4,28503.0,30983.9,31492.6,31571.5,31962.4,32203.0,32298.7],"wind":[null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,0,0,0,0,0,0,0,0,0,0,0,0,0,0,8.7,8.7,18.9,18.9,18.9,18.9,18.9,20.1,null,null,363.6,791.6,1320.2,1728.7,2260.6,2759.7,3629.7,4503.2,5751.3,6516.2,7005.4,7591.2,8832.4,10607.0,11396.2,11806.1,12870.8,14792.1],"solar":[null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,0,0,0,0,0,0,0,0,40.2,248.8,832.5,3420.7,5062.8,5995.2,6667.4,7815.6,9425.4,15613.4,20232.1,25926.7],"geothermal":[null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,null,17.5,17.5,17.5,17.5,17.5,17.5,17.5,17.5,17.5,17.5,17.5,17.5,17.5,17.5,17.5,17.5,17.5,17.5,17.5,15.0,15.0,15.0,81.9,169.2,29.8,77.2,94.2,114.2,162.2,310.8,404.9,623.9,820.9,1063.7,1282.5,1514.7,1613.2,1676.2,1691.3,1691.3,1733.5,1757.8],"oil":[60.2,64.7,69.4,71.6,76.9,79.0,79.5,83.4,95.2,103.4,116.7,118.7,119.7,139.1,143.2,181.1,219.0,220.2,240.5,274.8,291.8,309.9,329.5,329.8,348.3,361.1,388.4,617.7,598.6,598.6,837.4,1008.0,1111.2,1199.6,1275.2,1344.3,1428.9,1435.5,1421.1,1421.1,1421.1,1441.3,1441.3,1433.9,1727.8,1727.8,1725.9,1741.1,1741.4,1740.0,1747.8,1737.0,1529.8,1535.8,1541.7,1353.1,1387.6,1409.4,1532.0,1542.1,1585.6,1999.6,2400.2,2733.2,2569.2,2505.7,2396.5,2000.2,1818.6,1699.1,1593.3,1300.4,1285.5,616.3,594.9,522.7,445.3,380.2,370.6,189.4,189.4,135.4,135.4,135.4,135.4,118.6],"multi_fuel":[0,0,0,0,0,0,0,0,0,0,0,0,0,6.3,10.3,10.3,10.3,10.3,10.3,10.3,10.3,10.3,10.3,10.3,10.3,10.3,15.7,15.7,15.7,15.7,25.7,51.9,51.9,51.9,51.9,106.9,106.9,169.7,184.1,184.1,184.1,192.3,192.3,212.3,262.3,317.3,317.3,317.3,372.3,372.3,372.3,381.9,426.9,426.9,426.9,448.9,455.2,475.3,870.9,2344.3,2549.7,2758.5,2910.7,3112.9,3120.9,3268.3,3323.4,3384.0,4869.0,5137.6,5325.6,6810.8,6880.7,8020.4,7369.4,6961.0,6551.0,5196.6,5206.8,4889.1,4889.1,4897.8,4891.8,4874.3,4874.3,4760.8],"waste_other":[0.8,0.9,0.9,0.9,0.9,1.0,1.0,1.0,1.0,1.0,1.1,1.1,1.2,1.6,1.8,2.2,2.2,2.3,2.3,2.3,2.4,2.4,2.4,2.4,2.4,2.8,3.1,3.1,3.1,3.1,5.2,5.2,12.4,12.4,12.4,12.4,12.4,12.4,12.4,12.4,12.4,12.4,0,0,0,0,0,0,0,0,0,10.0,13.8,13.8,13.8,13.8,13.8,13.8,22.4,23.8,23.8,23.6,27.6,27.6,27.6,35.3,41.3,42.7,59.7,86.5,107.2,125.7,168.8,235.0,299.1,370.1,496.4,641.9,818.9,1170.5,1502.8,2051.1,2354.6,2446.4,2416.9,2405.2]},"labels":{"coal":"coal (hard, imported, lignite)","gas":"natural gas","hydro":"hydro","wind":"wind","solar":"solar","geothermal":"geothermal","oil":"oil products","multi_fuel":"multi-fuel plants","waste_other":"biomass, waste and other thermal"},"total":[217.0,222.0,226.7,236.4,243.9,246.1,247.4,251.4,305.5,381.8,407.8,423.2,437.8,499.5,516.9,611.6,886.1,939.4,1030.0,1161.0,1272.4,1323.9,1370.8,1381.1,1418.3,1490.5,1644.3,1962.2,1966.6,1967.2,2234.9,2577.9,2711.3,3192.5,3732.1,4186.6,4364.2,4727.2,4868.7,5118.7,5118.7,5537.6,6638.6,6935.1,8461.6,9121.6,10115.2,12495.1,14520.6,15808.2,16317.6,17209.1,18716.1,20337.6,20859.8,20954.3,21249.4,21891.9,23354.0,26119.3,27264.1,28332.4,31845.8,35587.0,36824.0,38843.5,40564.8,40835.7,41817.2,44761.2,49524.1,52911.1,57059.4,64007.5,69519.8,73146.7,78497.4,85200.0,88550.8,91267.0,95890.6,99819.6,103809.3,110914.0,116265.1,123303.0],"note":"Installed capacity of all power plants in T\u00fcrkiye at the end of each year, by source (TE\u0130A\u015e). Wind is counted inside geothermal in 2006 and 2007 (TE\u0130A\u015e footnote), so it shows no figure then."},"osm_plants":{"solar":{"added":29,"dup":5,"below":160,"no_capacity":611}},"coverage":{"wind":{"mapped_mw":12778,"mapped":214,"min_mw":20,"list_mw":13792.5,"list_farms":346,"list_date":"2024-12-31","national_mw":14792.1,"national_year":2025,"positions":{"osm":131,"gppd":1,"place":29,"district":4,"province":49},"by_province":{"10":1511.7,"48":226.2,"54":343.4,"39":459.1,"09":445.2,"35":1993.1,"42":418.5,"45":752.7,"52":54.0,"38":404.2,"60":141.6,"16":604.5,"17":1247.2,"59":308.4,"40":218.4,"05":141.1,"01":33.4,"44":11.7,"71":43.2,"31":443.7,"34":1004.3,"65":53.2,"66":54.0,"11":234.4,"77":305.2,"46":121.5,"18":51.0,"22":98.4,"33":253.5,"80":265.3,"20":74.8,"41":99.8,"03":397.2,"23":42.0,"69":44.2,"57":42.0,"55":56.0,"43":50.8,"04":57.6,"58":155.3,"70":46.8,"26":52.8,"27":65.5,"12":49.7,"13":4.8,"02":27.5,"32":127.2,"64":156.0},"by_province_source":"tr_t_wind_farms"},"solar":{"mapped_mw":3320,"mapped":35,"min_mw":20,"year":2025,"unlicensed_mw":22569.49,"licensed_mw":2539.53,"national_mw":25926.7,"national_year":2025,"by_province":{"01":562.38,"02":189.24,"03":610.98,"04":181.39,"05":145.34,"06":1112.25,"07":509.67,"08":1.17,"09":281.97,"10":388.23,"11":229.15,"12":49.95,"13":77.87,"14":79.15,"15":296.7,"16":576.54,"17":70.89,"18":184.74,"19":310.95,"20":630.44,"21":260.81,"22":43.12,"23":376.71,"24":174.98,"25":439.46,"26":697.83,"27":1241.28,"28":34.05,"29":35.98,"30":0.54,"31":108.35,"32":525.3,"33":444.5,"34":218.97,"35":953.3,"36":68.47,"37":48.83,"38":1013.07,"39":56.1,"40":164.39,"41":239.95,"42":1529.85,"43":316.46,"44":290.6,"45":825.54,"46":624.35,"47":139.28,"48":206.43,"49":47.36,"50":273.06,"51":291.51,"52":8.69,"53":7.28,"54":158.79,"55":145.61,"56":58.89,"57":19.35,"58":266.46,"59":265.14,"60":87.87,"61":21.63,"62":4.26,"63":1038.69,"64":346.65,"65":176.21,"66":306.08,"67":50.33,"68":301.04,"69":51.71,"70":282.88,"71":132.11,"72":67.18,"73":31.54,"74":23.77,"75":7.25,"76":9.26,"77":19.38,"78":33.35,"79":114.31,"80":285.04,"81":69.34},"by_province_source":"tr_t_epdk_capacity"}},"wind_farms":{"farms":214,"mw":12771.7,"below":132,"below_mw":1020.8,"osm":131,"gppd":1,"place":29,"district":4,"province":49,"refs_unmatched":18,"refs_unmatched_mw":1035}}}